Novarly ParcelRenewable sites

Renewable sitesMorfa Farm

Morfa Farm

Morfa Farm is an operational 2 MW solar farm in Vale of Glamorgan, generating since 19 December 2016. Planning permission was granted on 20 November 2015, 4 months after submission. Operator of record: Lightsource Renewable Energy.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 19 December 2016
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Vale of Glamorgan
Authority
Wales

Planning and build timeline

Application submitted15 July 2015
Permission granted20 November 2015
4 months after submission
Operational19 December 2016
13 months after consent

Screening a site of your own?

RedlineUK · £39

Vale of Glamorgan approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Morfa Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Vale of Glamorgan’s record on solar

Vale of Glamorgan has decided 25 solar farms and approved 96%, taking a median of 4.2 months. See every solar farm decision in Vale of Glamorgan

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
53.3 km
Solar Photovoltaics · Operational
4.46.4 km
Solar Photovoltaics · Operational
3.46.8 km
Solar Photovoltaics · Operational
77.1 km
Solar Photovoltaics · Operational
57.9 km
Solar Photovoltaics · Operational
7.48.4 km
Solar Photovoltaics · Under Construction
0.88.4 km
Solar Photovoltaics · Operational
2.28.6 km

How big is Morfa Farm?

Morfa Farm has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Morfa Farm?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Morfa Farm approved and built?

The application was submitted on 15 July 2015. Permission was granted on 20 November 2015, 4 months later. The site became operational on 19 December 2016, 13 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1862.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode