Whitehall Farm, Llanharry Road - Solar PV Panels

Whitehall Farm, Llanharry Road - Solar PV Panels is under construction in Rhondda Cynon Taf with a recorded capacity of 1.3 MW.

1.3 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Mccarthy Contractors (Bridgend) Limited
Rhondda Cynon Taf
Authority
Wales

Planning and build timeline

Application submitted2024-07-09
Permission granted2024-09-17
2 months after submission
Operationalnot recorded

Rhondda Cynon Taf’s record on solar

Rhondda Cynon Taf has decided 13 solar farms and approved 100%, taking a median of 5 months. See every solar farm decision in Rhondda Cynon Taf

Other built sites within 15 km

SiteMWDistance
Agricultural Land at Trecastle
Solar Photovoltaics · Operational
40.8 km
Mynydd Portref
Wind Onshore · Operational
9.43.8 km
Graig Fatha Farm
Wind Onshore · Operational
2.53.8 km
Mynydd Portref Wind Farm extension
Wind Onshore · Operational
124 km
Energy Centre Royal Mint
Battery · Operational
204.6 km
Coed Ely - Solar Farm
Solar Photovoltaics · Under Construction
64.8 km
West of Rhiwfelin Fach Farm
Wind Onshore · Operational
1.54.9 km
Taff Ely Wind Farm
Wind Onshore · Operational
95.3 km

How big is Whitehall Farm, Llanharry Road - Solar PV Panels?

Whitehall Farm, Llanharry Road - Solar PV Panels has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Whitehall Farm, Llanharry Road - Solar PV Panels?

REPD records the operator as Mccarthy Contractors (Bridgend) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Whitehall Farm, Llanharry Road - Solar PV Panels approved and built?

The application was submitted on 2024-07-09. Permission was granted on 2024-09-17, 2 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14356.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council