Whitehall Farm, Llanharry Road - Solar PV Panels
Whitehall Farm, Llanharry Road - Solar PV Panels is under construction in Rhondda Cynon Taf with a recorded capacity of 1.3 MW.
Planning and build timeline
| Application submitted | 2024-07-09 |
| Permission granted | 2024-09-17 2 months after submission |
| Operational | not recorded |
Rhondda Cynon Taf’s record on solar
Rhondda Cynon Taf has decided 13 solar farms and approved 100%, taking a median of 5 months. See every solar farm decision in Rhondda Cynon Taf →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Agricultural Land at Trecastle Solar Photovoltaics · Operational | 4 | 0.8 km |
Mynydd Portref Wind Onshore · Operational | 9.4 | 3.8 km |
Graig Fatha Farm Wind Onshore · Operational | 2.5 | 3.8 km |
Mynydd Portref Wind Farm extension Wind Onshore · Operational | 12 | 4 km |
Energy Centre Royal Mint Battery · Operational | 20 | 4.6 km |
Coed Ely - Solar Farm Solar Photovoltaics · Under Construction | 6 | 4.8 km |
West of Rhiwfelin Fach Farm Wind Onshore · Operational | 1.5 | 4.9 km |
Taff Ely Wind Farm Wind Onshore · Operational | 9 | 5.3 km |
How big is Whitehall Farm, Llanharry Road - Solar PV Panels?
Whitehall Farm, Llanharry Road - Solar PV Panels has a recorded installed capacity of 1.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Whitehall Farm, Llanharry Road - Solar PV Panels?
REPD records the operator as Mccarthy Contractors (Bridgend) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Whitehall Farm, Llanharry Road - Solar PV Panels approved and built?
The application was submitted on 2024-07-09. Permission was granted on 2024-09-17, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14356.