Novarly ParcelRenewable sites

Renewable sitesSalford Lodge

Salford Lodge

Salford Lodge is an operational 5 MW solar farm in Stratford-on-Avon, generating since 1 August 2015. Planning permission was granted on 11 December 2014, 3 months after submission. Operator of record: AR Partners.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 1 August 2015
Solar Photovoltaics
Technology
AR Partners
Stratford-on-Avon
Authority
England

Planning and build timeline

Application submitted11 September 2014
Permission granted11 December 2014
3 months after submission
Operational1 August 2015
8 months after consent

Screening a site of your own?

RedlineUK · £39

Stratford-on-Avon approves 94% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Salford Lodge’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Stratford-on-Avon’s record on solar

Stratford-on-Avon has decided 36 solar farms and approved 94%, taking a median of 3.7 months. See every solar farm decision in Stratford-on-Avon

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.83.2 km
Solar Photovoltaics · Under Construction
304.9 km
Solar Photovoltaics · Operational
3.36.1 km
Solar Photovoltaics · Operational
1.46.3 km
Solar Photovoltaics · Operational
97 km
Battery · Operational
7.1 km
Solar Photovoltaics · Operational
307.1 km
Landfill Gas · Operational
3.47.3 km

How big is Salford Lodge?

Salford Lodge has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Salford Lodge?

REPD records the operator as AR Partners. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Salford Lodge approved and built?

The application was submitted on 11 September 2014. Permission was granted on 11 December 2014, 3 months later. The site became operational on 1 August 2015, 8 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4850.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode