Renewable sites › Salford Lodge
Salford Lodge
Salford Lodge is operational in Stratford-on-Avon with a recorded capacity of 5 MW, and has been generating since 2015-08-01.
Planning and build timeline
| Application submitted | 2014-09-11 |
| Permission granted | 2014-12-11 3 months after submission |
| Operational | 2015-08-01 8 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Stratford-on-Avon’s record on solar
Stratford-on-Avon has decided 36 solar farms and approved 94%, taking a median of 3.7 months. See every solar farm decision in Stratford-on-Avon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Morton Wood Farm Solar Photovoltaics · Operational | 4.8 | 3.2 km |
Bishampton Solar Farm Solar Photovoltaics · Under Construction | 30 | 4.9 km |
Bypass Nurseries Solar Farm Solar Photovoltaics · Operational | 3.3 | 6.1 km |
Sytchwythy Fields Solar Photovoltaics · Operational | 1.4 | 6.3 km |
Rotherdale Farm - extension Solar Photovoltaics · Operational | 9 | 7 km |
Littleton Solar Farm Solar Photovoltaics · Operational | 30 | 7.1 km |
Littleton Solar Farm Battery · Operational | — | 7.1 km |
Hill and Moor Landfill Scheme Landfill Gas · Operational | 3.4 | 7.3 km |
How big is Salford Lodge?
Salford Lodge has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Salford Lodge?
REPD records the operator as AR Partners. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Salford Lodge approved and built?
The application was submitted on 2014-09-11. Permission was granted on 2014-12-11, 3 months later. The site became operational on 2015-08-01, 8 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4850.
Novarly Parcel · official public data, read properly · parcel.novarly.com