Novarly ParcelRenewable sites

Renewable sitesLittleton Solar Farm

Littleton Solar Farm

Littleton Solar Farm is an operational 30 MW solar farm in Wychavon, generating since 27 March 2026. Planning permission was granted on 2 June 2021, 9 months after submission. Operator of record: Stark Energy / SSE Renewables.

30 MW
Capacity
as recorded in REPD
Operational
Status
since 27 March 2026
Solar Photovoltaics
Technology
Stark Energy / SSE Renewables
Wychavon
Authority
England

Planning and build timeline

Application submitted9 September 2020
Permission granted2 June 2021
9 months after submission
Operational27 March 2026
58 months after consent

Screening a site of your own?

RedlineUK · £39

Wychavon approves 97% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Littleton Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wychavon’s record on solar

Wychavon has decided 34 solar farms and approved 97%, taking a median of 4.4 months. See every solar farm decision in Wychavon

Other built sites within 15 km

SiteMWDistance
Battery · Operational
0 km
Solar Photovoltaics · Operational
0.153.8 km
Solar Photovoltaics · Operational
1.44.6 km
Solar Photovoltaics · Operational
2.84.7 km
Solar Photovoltaics · Operational
3.34.9 km
Solar Photovoltaics · Operational
45.1 km
Solar Photovoltaics · Operational
226.3 km
Battery · Operational
16.8 km

How big is Littleton Solar Farm?

Littleton Solar Farm has a recorded installed capacity of 30 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Littleton Solar Farm?

REPD records the operator as Stark Energy / SSE Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Littleton Solar Farm approved and built?

The application was submitted on 9 September 2020. Permission was granted on 2 June 2021, 9 months later. The site became operational on 27 March 2026, 58 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9038.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode