Novarly ParcelRenewable sites

Renewable sitesBypass Nurseries Solar Farm

Bypass Nurseries Solar Farm

Bypass Nurseries Solar Farm is operational in Wychavon with a recorded capacity of 3.3 MW, and has been generating since 2014-07-28.

3.3 MW
Capacity
as recorded in REPD
Operational
Status
since 2014-07-28
Solar Photovoltaics
Technology
Sun Spirit
Wychavon
Authority
England

Planning and build timeline

Application submitted2012-12-10
Permission granted2013-04-02
4 months after submission
Operational2014-07-28
16 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wychavon’s record on solar

Wychavon has decided 34 solar farms and approved 97%, taking a median of 4.4 months. See every solar farm decision in Wychavon

Other built sites within 15 km

SiteMWDistance
Sytchwythy Fields
Solar Photovoltaics · Operational
1.40.4 km
Mount Farm
Solar Photovoltaics · Operational
223.5 km
Plant Produce - Solar PV panels
Solar Photovoltaics · Operational
0.154.6 km
Littleton Solar Farm
Battery · Operational
4.9 km
Littleton Solar Farm
Solar Photovoltaics · Operational
304.9 km
The Rainbows Solar Farm
Solar Photovoltaics · Operational
45.4 km
Salford Lodge
Solar Photovoltaics · Operational
56.1 km
Willersey solar farm
Battery · Operational
17.3 km

How big is Bypass Nurseries Solar Farm?

Bypass Nurseries Solar Farm has a recorded installed capacity of 3.3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bypass Nurseries Solar Farm?

REPD records the operator as Sun Spirit. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bypass Nurseries Solar Farm approved and built?

The application was submitted on 2012-12-10. Permission was granted on 2013-04-02, 4 months later. The site became operational on 2014-07-28, 16 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1890.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council