Sytchwythy Fields

Sytchwythy Fields is operational in Wychavon with a recorded capacity of 1.4 MW, and has been generating since 2017-03-31.

1.4 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-31
Solar Photovoltaics
Technology
AR Partners
Wychavon
Authority
England

Planning and build timeline

Application submitted2015-01-15
Permission grantednot recorded
Operational2017-03-31

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wychavon’s record on solar

Wychavon has decided 34 solar farms and approved 97%, taking a median of 4.4 months. See every solar farm decision in Wychavon

Other built sites within 15 km

SiteMWDistance
Bypass Nurseries Solar Farm
Solar Photovoltaics · Operational
3.30.4 km
Mount Farm
Solar Photovoltaics · Operational
223.2 km
Plant Produce - Solar PV panels
Solar Photovoltaics · Operational
0.154.2 km
Littleton Solar Farm
Battery · Operational
4.6 km
Littleton Solar Farm
Solar Photovoltaics · Operational
304.6 km
The Rainbows Solar Farm
Solar Photovoltaics · Operational
45 km
Salford Lodge
Solar Photovoltaics · Operational
56.3 km
Willersey solar farm
Battery · Operational
16.9 km

How big is Sytchwythy Fields?

Sytchwythy Fields has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sytchwythy Fields?

REPD records the operator as AR Partners. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sytchwythy Fields approved and built?

The application was submitted on 2015-01-15. REPD does not record a grant date. The site became operational on 2017-03-31.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6458.