Novarly ParcelRenewable sites

Renewable sitesBishampton Solar Farm

Bishampton Solar Farm

Bishampton Solar Farm is under construction in Wychavon with a recorded capacity of 30 MW.

30 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Infinis
Wychavon
Authority
England

Planning and build timeline

Application submitted2020-10-13
Permission granted2021-11-05
13 months after submission
Operationalnot recorded

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Wychavon’s record on solar

Wychavon has decided 34 solar farms and approved 97%, taking a median of 4.4 months. See every solar farm decision in Wychavon

Other built sites within 15 km

SiteMWDistance
Rotherdale Farm - extension
Solar Photovoltaics · Operational
92.4 km
Rotherdale Farm
Solar Photovoltaics · Operational
53.2 km
Morton Wood Farm
Solar Photovoltaics · Operational
4.83.8 km
Hill and Moor Landfill Scheme
Landfill Gas · Operational
3.43.8 km
Salford Lodge
Solar Photovoltaics · Operational
54.9 km
Bypass Nurseries Solar Farm
Solar Photovoltaics · Operational
3.38.7 km
Sytchwythy Fields
Solar Photovoltaics · Operational
1.49.1 km
Norton Fields Farm
Wind Onshore · Operational
1.39.6 km

How big is Bishampton Solar Farm?

Bishampton Solar Farm has a recorded installed capacity of 30 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Bishampton Solar Farm?

REPD records the operator as Infinis. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Bishampton Solar Farm approved and built?

The application was submitted on 2020-10-13. Permission was granted on 2021-11-05, 13 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8228.