Renewable sites › Littleton Solar Farm
Littleton Solar Farm
Littleton Solar Farm is an operational battery storage site in Wychavon, generating since 27 March 2026. Planning permission was granted on 6 January 2021, 4 months after submission. Operator of record: Stark Energy / SSE Renewables.
Planning and build timeline
| Application submitted | 9 September 2020 |
| Permission granted | 6 January 2021 4 months after submission |
| Operational | 27 March 2026 63 months after consent |
Screening a site of your own?
Wychavon approves 100% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Littleton Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Wychavon’s record on battery storage
Wychavon has decided 12 battery storage schemes and approved 100%, taking a median of 5.7 months. See every battery storage scheme decision in Wychavon →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 30 | 0 km |
Solar Photovoltaics · Operational | 0.15 | 3.8 km |
Solar Photovoltaics · Operational | 1.4 | 4.6 km |
Solar Photovoltaics · Operational | 2.8 | 4.7 km |
Solar Photovoltaics · Operational | 3.3 | 4.9 km |
Solar Photovoltaics · Operational | 4 | 5.1 km |
Solar Photovoltaics · Operational | 22 | 6.3 km |
Battery · Operational | 1 | 6.8 km |
How big is Littleton Solar Farm?
REPD does not record an installed capacity for Littleton Solar Farm.
Who operates Littleton Solar Farm?
REPD records the operator as Stark Energy / SSE Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Littleton Solar Farm approved and built?
The application was submitted on 9 September 2020. Permission was granted on 6 January 2021, 4 months later. The site became operational on 27 March 2026, 63 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9039.