Ricoh UK Products is an operational 1.2 MW solar farm in Telford and Wrekin, generating since 1 July 2021. Planning permission was granted on 28 August 2020, 5 months after submission. Operator of record: Push Energy.

1.2 MW
Capacity
as recorded in REPD
Operational
Status
since 1 July 2021
Solar Photovoltaics
Technology
Push Energy
Telford and Wrekin
Authority
England

Planning and build timeline

Application submitted31 March 2020
Permission granted28 August 2020
5 months after submission
Operational1 July 2021
10 months after consent

Screening a site of your own?

RedlineUK · £39

Telford and Wrekin approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Ricoh UK Products’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Telford and Wrekin’s record on solar

Telford and Wrekin has decided 23 solar farms and approved 100%, taking a median of 2.3 months. See every solar farm decision in Telford and Wrekin

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
1.42.6 km
Solar Photovoltaics · Operational
3.82.6 km
Solar Photovoltaics · Operational
53 km
Solar Photovoltaics · Operational
8.24.3 km
Landfill Gas · Operational
2.95.8 km
Solar Photovoltaics · Operational
46.3 km
Solar Photovoltaics · Under Construction
306.3 km
Battery · Under Construction
7 km

How big is Ricoh UK Products?

Ricoh UK Products has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Ricoh UK Products?

REPD records the operator as Push Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Ricoh UK Products approved and built?

The application was submitted on 31 March 2020. Permission was granted on 28 August 2020, 5 months later. The site became operational on 1 July 2021, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7968.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode