Granville Landfill Site

Granville Landfill Site is operational in Telford and Wrekin with a recorded capacity of 1.4 MW, and has been generating since 1999-10-01.

1.4 MW
Capacity
as recorded in REPD
Operational
Status
since 1999-10-01
Landfill Gas
Technology
Biogas Technology Ltd/Natural Power
Telford and Wrekin
Authority
England

Planning and build timeline

Application submitted1994-04-30
Permission granted1994-07-01
2 months after submission
Operational1999-10-01
63 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Granville Road Solar Farm
Solar Photovoltaics · Operational
50.5 km
Lyreco - Telford Distribution Centre
Solar Photovoltaics · Operational
3.80.9 km
Ricoh UK Products
Solar Photovoltaics · Operational
1.22.6 km
Sheriffhales Solar Farm
Solar Photovoltaics · Operational
8.22.7 km
Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage
Battery · Under Construction
4.7 km
Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage
Solar Photovoltaics · Under Construction
254.7 km
Wheat Leasows Solar Park
Solar Photovoltaics · Operational
45.5 km
Steeraway Farm - Solar Farm
Solar Photovoltaics · Under Construction
307.4 km

How big is Granville Landfill Site?

Granville Landfill Site has a recorded installed capacity of 1.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Granville Landfill Site?

REPD records the operator as Biogas Technology Ltd/Natural Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Granville Landfill Site approved and built?

The application was submitted on 1994-04-30. Permission was granted on 1994-07-01, 2 months later. The site became operational on 1999-10-01, 63 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 562.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council