Novarly ParcelRenewable sites

Renewable sitesTwitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage

Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage

Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage is a battery storage site under construction in Telford and Wrekin. Planning permission was granted on 29 June 2022, 6 months after submission. Operator of record: Ethical Power.

Capacity
as recorded in REPD
Under Construction
Status
no operational date
Battery
Technology
Ethical Power
Telford and Wrekin
Authority
England

Planning and build timeline

Application submitted22 December 2021
Permission granted29 June 2022
6 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Telford and Wrekin approves 89% of battery storage schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented battery storage scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Telford and Wrekin’s record on battery storage

Telford and Wrekin has decided 9 battery storage schemes and approved 89%, taking a median of 6.2 months. See every battery storage scheme decision in Telford and Wrekin

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
250 km
Solar Photovoltaics · Operational
54.2 km
Solar Photovoltaics · Operational
3.84.4 km
Landfill Gas · Operational
1.44.7 km
Solar Photovoltaics · Operational
44.8 km
Solar Photovoltaics · Operational
8.25.9 km
Solar Photovoltaics · Operational
1.27 km
Solar Photovoltaics · Operational
58.7 km

How big is Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage?

REPD does not record an installed capacity for Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage.

Who operates Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage?

REPD records the operator as Ethical Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage approved and built?

The application was submitted on 22 December 2021. Permission was granted on 29 June 2022, 6 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10418.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode