Novarly ParcelRenewable sites

Renewable sitesCandles/Coalmoor Landfill

Candles/Coalmoor Landfill

Candles/Coalmoor Landfill is operational in Telford and Wrekin with a recorded capacity of 2.9 MW, and has been generating since 2005-10-01.

2.9 MW
Capacity
as recorded in REPD
Operational
Status
since 2005-10-01
Landfill Gas
Technology
ONYX LANDFILL LTD
Telford and Wrekin
Authority
England

Planning and build timeline

Application submitted1999-02-25
Permission granted2001-09-01
30 months after submission
Operational2005-10-01
49 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Steeraway Farm - Solar Farm
Solar Photovoltaics · Under Construction
302.1 km
Ricoh UK Products
Solar Photovoltaics · Operational
1.25.8 km
Wheat Leasows Solar Park
Solar Photovoltaics · Operational
46.2 km
Tiddiecross Solar Farm
Solar Photovoltaics · Operational
10.56.6 km
Lyreco - Telford Distribution Centre
Solar Photovoltaics · Operational
3.86.9 km
Granville Landfill Site
Landfill Gas · Operational
1.47.5 km
Granville Road Solar Farm
Solar Photovoltaics · Operational
57.6 km
Rushmoor Lane Farm (Cheshire Coppice)
Solar Photovoltaics · Operational
57.7 km

How big is Candles/Coalmoor Landfill?

Candles/Coalmoor Landfill has a recorded installed capacity of 2.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Candles/Coalmoor Landfill?

REPD records the operator as ONYX LANDFILL LTD. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Candles/Coalmoor Landfill approved and built?

The application was submitted on 1999-02-25. Permission was granted on 2001-09-01, 30 months later. The site became operational on 2005-10-01, 49 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 557.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council