Renewable sitesCandles/Coalmoor Landfill

Candles/Coalmoor Landfill

Candles/Coalmoor Landfill is an operational 2.9 MW landfill gas site in Telford and Wrekin, generating since 1 October 2005. Planning permission was granted on 1 September 2001, 30 months after submission. Operator of record: ONYX LANDFILL LTD.

2.9 MW
Capacity
as recorded in REPD
Operational
Status
since 1 October 2005
Landfill Gas
Technology
ONYX LANDFILL LTD
Telford and Wrekin
Authority
England

Planning and build timeline

Application submitted25 February 1999
Permission granted1 September 2001
30 months after submission
Operational1 October 2005
49 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Telford and Wrekin: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Candles/Coalmoor Landfill’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Under Construction
302.1 km
Solar Photovoltaics · Operational
1.25.8 km
Solar Photovoltaics · Operational
46.2 km
Solar Photovoltaics · Operational
10.56.6 km
Solar Photovoltaics · Operational
3.86.9 km
Landfill Gas · Operational
1.47.5 km
Solar Photovoltaics · Operational
57.6 km
Solar Photovoltaics · Operational
57.7 km

How big is Candles/Coalmoor Landfill?

Candles/Coalmoor Landfill has a recorded installed capacity of 2.9 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Candles/Coalmoor Landfill?

REPD records the operator as ONYX LANDFILL LTD. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Candles/Coalmoor Landfill approved and built?

The application was submitted on 25 February 1999. Permission was granted on 1 September 2001, 30 months later. The site became operational on 1 October 2005, 49 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 557.