Novarly ParcelRenewable sites

Renewable sitesSheriffhales Solar Farm

Sheriffhales Solar Farm

Sheriffhales Solar Farm is operational in Shropshire with a recorded capacity of 8.2 MW, and has been generating since 2015-12-16.

8.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-16
Solar Photovoltaics
Technology
Lightsource Renewable Energy
Shropshire
Authority
England

Planning and build timeline

Application submitted2015-03-27
Permission granted2015-07-01
3 months after submission
Operational2015-12-16
6 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Shropshire’s record on solar

Shropshire has decided 68 solar farms and approved 94%, taking a median of 3.2 months. See every solar farm decision in Shropshire

Other built sites within 15 km

SiteMWDistance
Granville Landfill Site
Landfill Gas · Operational
1.42.7 km
Granville Road Solar Farm
Solar Photovoltaics · Operational
52.9 km
Lyreco - Telford Distribution Centre
Solar Photovoltaics · Operational
3.83.6 km
Ricoh UK Products
Solar Photovoltaics · Operational
1.24.3 km
Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage
Solar Photovoltaics · Under Construction
255.9 km
Twitch Hill, Cheswell Grange Farm - Solar Farm & Battery Storage
Battery · Under Construction
5.9 km
Wheat Leasows Solar Park
Solar Photovoltaics · Operational
48.1 km
Candles/Coalmoor Landfill
Landfill Gas · Operational
2.99.9 km

How big is Sheriffhales Solar Farm?

Sheriffhales Solar Farm has a recorded installed capacity of 8.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Sheriffhales Solar Farm?

REPD records the operator as Lightsource Renewable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Sheriffhales Solar Farm approved and built?

The application was submitted on 2015-03-27. Permission was granted on 2015-07-01, 3 months later. The site became operational on 2015-12-16, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5169.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council