Renewable sites › Steeraway Farm - Solar Farm
Steeraway Farm - Solar Farm
Steeraway Farm - Solar Farm is under construction in Telford and Wrekin with a recorded capacity of 30 MW.
Planning and build timeline
| Application submitted | 2021-10-28 |
| Permission granted | 2023-05-09 18 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Telford and Wrekin’s record on solar
Telford and Wrekin has decided 23 solar farms and approved 100%, taking a median of 2.3 months. See every solar farm decision in Telford and Wrekin →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Candles/Coalmoor Landfill Landfill Gas · Operational | 2.9 | 2.1 km |
Wheat Leasows Solar Park Solar Photovoltaics · Operational | 4 | 4.5 km |
Tiddiecross Solar Farm Solar Photovoltaics · Operational | 10.5 | 4.8 km |
Rushmoor Lane Farm (Cheshire Coppice) Solar Photovoltaics · Operational | 5 | 5.6 km |
Ricoh UK Products Solar Photovoltaics · Operational | 1.2 | 6.3 km |
Lyreco - Telford Distribution Centre Solar Photovoltaics · Operational | 3.8 | 6.5 km |
Granville Road Solar Farm Solar Photovoltaics · Operational | 5 | 7.3 km |
Granville Landfill Site Landfill Gas · Operational | 1.4 | 7.4 km |
How big is Steeraway Farm - Solar Farm?
Steeraway Farm - Solar Farm has a recorded installed capacity of 30 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Steeraway Farm - Solar Farm?
REPD records the operator as Enviromena. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Steeraway Farm - Solar Farm approved and built?
The application was submitted on 2021-10-28. Permission was granted on 2023-05-09, 18 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 10089.