Novarly ParcelRenewable sites

Renewable sitesLyreco - Telford Distribution Centre

Lyreco - Telford Distribution Centre

Lyreco - Telford Distribution Centre is an operational 3.8 MW solar farm in Telford and Wrekin, generating since 26 January 2016. REPD does not record the planning grant date. Operator of record: Addison Energy.

3.8 MW
Capacity
as recorded in REPD
Operational
Status
since 26 January 2016
Solar Photovoltaics
Technology
Addison Energy
Telford and Wrekin
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational26 January 2016

Screening a site of your own?

RedlineUK · £39

Telford and Wrekin approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Lyreco - Telford Distribution Centre’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Telford and Wrekin’s record on solar

Telford and Wrekin has decided 23 solar farms and approved 100%, taking a median of 2.3 months. See every solar farm decision in Telford and Wrekin

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
50.7 km
Landfill Gas · Operational
1.40.9 km
Solar Photovoltaics · Operational
1.22.6 km
Solar Photovoltaics · Operational
8.23.6 km
Battery · Under Construction
4.4 km
Solar Photovoltaics · Under Construction
254.4 km
Solar Photovoltaics · Operational
44.6 km
Solar Photovoltaics · Under Construction
306.5 km

How big is Lyreco - Telford Distribution Centre?

Lyreco - Telford Distribution Centre has a recorded installed capacity of 3.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Lyreco - Telford Distribution Centre?

REPD records the operator as Addison Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Lyreco - Telford Distribution Centre approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 26 January 2016.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5602.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode