Renewable sites › Lyreco - Telford Distribution Centre
Lyreco - Telford Distribution Centre
Lyreco - Telford Distribution Centre is an operational 3.8 MW solar farm in Telford and Wrekin, generating since 26 January 2016. REPD does not record the planning grant date. Operator of record: Addison Energy.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 26 January 2016 |
Screening a site of your own?
Telford and Wrekin approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Lyreco - Telford Distribution Centre’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Telford and Wrekin’s record on solar
Telford and Wrekin has decided 23 solar farms and approved 100%, taking a median of 2.3 months. See every solar farm decision in Telford and Wrekin →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 0.7 km |
Landfill Gas · Operational | 1.4 | 0.9 km |
Solar Photovoltaics · Operational | 1.2 | 2.6 km |
Solar Photovoltaics · Operational | 8.2 | 3.6 km |
Battery · Under Construction | — | 4.4 km |
Solar Photovoltaics · Under Construction | 25 | 4.4 km |
Solar Photovoltaics · Operational | 4 | 4.6 km |
Solar Photovoltaics · Under Construction | 30 | 6.5 km |
How big is Lyreco - Telford Distribution Centre?
Lyreco - Telford Distribution Centre has a recorded installed capacity of 3.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lyreco - Telford Distribution Centre?
REPD records the operator as Addison Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lyreco - Telford Distribution Centre approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 26 January 2016.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5602.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode