Reaps Moss Wind Farm is an operational 10.2 MW onshore wind farm in Rossendale, generating since 31 March 2015. Planning permission was granted on 14 October 2009, 32 months after submission. Operator of record: Infrared Capital Partners.
Planning and build timeline
| Application submitted | 19 February 2007 |
| Permission granted | 14 October 2009 32 months after submission |
| Operational | 31 March 2015 66 months after consent |
Screening a site of your own?
Rossendale approves 40% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Reaps Moss Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 5 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Rossendale’s record on onshore wind
Rossendale has decided 5 onshore wind schemes and approved 40%, taking a median of 15.8 months. See every onshore wind scheme decision in Rossendale →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Wind Onshore · Operational | 12.3 | 0.5 km |
Wind Onshore · Operational | 23.8 | 4.8 km |
Wind Onshore · Operational | 13.6 | 5.1 km |
Wind Onshore · Operational | 9.6 | 5.6 km |
Wind Onshore · Operational | 16 | 5.6 km |
Landfill Gas · Operational | 2 | 6.6 km |
Wind Onshore · Operational | 65 | 7.5 km |
Landfill Gas · Operational | 1.6 | 8.6 km |
How big is Reaps Moss Wind Farm?
Reaps Moss Wind Farm has a recorded installed capacity of 10.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Reaps Moss Wind Farm?
REPD records the operator as Infrared Capital Partners. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Reaps Moss Wind Farm approved and built?
The application was submitted on 19 February 2007. Permission was granted on 14 October 2009, 32 months later. The site became operational on 31 March 2015, 66 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4655.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode