Reaps Moss Wind Farm is operational in Rossendale with a recorded capacity of 10.2 MW, and has been generating since 2015-03-31.

10.2 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-03-31
Wind Onshore
Technology
Infrared Capital Partners
Rossendale
Authority
England

Planning and build timeline

Application submitted2007-02-19
Permission granted2009-10-14
32 months after submission
Operational2015-03-31
66 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Rossendale’s record on onshore wind

Rossendale has decided 5 onshore wind schemes and approved 40%, taking a median of 15.8 months. See every onshore wind scheme decision in Rossendale

Other built sites within 15 km

SiteMWDistance
Todmorden Moor
Wind Onshore · Operational
12.30.5 km
Crook Hill (Rochdale MBC) 2 of 2
Wind Onshore · Operational
23.84.8 km
Crook Hill (Calderdale MBC) 1 of 2
Wind Onshore · Operational
13.65.1 km
Coal Clough Wind Farm
Wind Onshore · Operational
9.65.6 km
Coal Clough Wind Farm Repowering
Wind Onshore · Operational
165.6 km
Deerplay Landfill Site
Landfill Gas · Operational
26.6 km
Scout Moor Windfarm
Wind Onshore · Operational
657.5 km
Horncliffe Quarry (Extension)
Landfill Gas · Operational
18.6 km

How big is Reaps Moss Wind Farm?

Reaps Moss Wind Farm has a recorded installed capacity of 10.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Reaps Moss Wind Farm?

REPD records the operator as Infrared Capital Partners. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Reaps Moss Wind Farm approved and built?

The application was submitted on 2007-02-19. Permission was granted on 2009-10-14, 32 months later. The site became operational on 2015-03-31, 66 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4655.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council