Coal Clough Wind Farm

Coal Clough Wind Farm is operational in Burnley with a recorded capacity of 9.6 MW, and has been generating since 1993-02-01.

9.6 MW
Capacity
as recorded in REPD
Operational
Status
since 1993-02-01
Wind Onshore
Technology
Renewable Energy Systems (RES)
Burnley
Authority
England

Planning and build timeline

Application submitted1991-11-25
Permission granted1992-07-03
7 months after submission
Operational1993-02-01
7 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Burnley’s record on onshore wind

Burnley has decided 8 onshore wind schemes and approved 63%, taking a median of 9.4 months. See every onshore wind scheme decision in Burnley

Other built sites within 15 km

SiteMWDistance
Coal Clough Wind Farm Repowering
Wind Onshore · Operational
160 km
Deerplay Landfill Site
Landfill Gas · Operational
24.6 km
Todmorden Moor
Wind Onshore · Operational
12.35.5 km
Reaps Moss Wind Farm
Wind Onshore · Operational
10.25.6 km
Rowley
Landfill Gas · Operational
1.96.9 km
Queens Park Energy
Landfill Gas · Operational
1.97.2 km
Queen's Park Road Energy
Landfill Gas · Operational
1.87.4 km
Widow Hill, Balderstone Lane - Battery Energy Storage System
Battery · Under Construction
707.4 km

How big is Coal Clough Wind Farm?

Coal Clough Wind Farm has a recorded installed capacity of 9.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Coal Clough Wind Farm?

REPD records the operator as Renewable Energy Systems (RES). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Coal Clough Wind Farm approved and built?

The application was submitted on 1991-11-25. Permission was granted on 1992-07-03, 7 months later. The site became operational on 1993-02-01, 7 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3079.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council