Onshore wind planning in Rossendale

Rossendale has decided 5 onshore wind schemes and approved 40% of them, taking a median of 15.8 months to decide. Consented capacity: 75 MW. 1 application still awaiting a decision.

40%
Approved
2 granted · 3 refused
15.8 mo
Median decision
UK 11.5 mo
75 MW
Consented
47 MW refused
0
Appeals
no appeals recorded

⚠️ Small caseload (5 decided). Percentages here move a lot with one more decision — read them as indicative, not as a reliable rate.

How Rossendale compares

Against the 75 UK authorities with 5+ onshore wind decisions, Rossendale sits in the 12th percentile for approval rate (28 points below the UK average) and the 39th percentile for speed.

Screening a site of your own?

RedlineUK · £39

Rossendale approves 40% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site£39
Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Every recorded scheme (6)

SchemeMWStatusDecided
Scout Moor Windfarm (extension)
Peel Holdings and UUGE · 2015/0112 · 26.5 mo to decide
36.8Application Refused2017-07-06
Reaps Moss Wind Farm
Infrared Capital Partners · 2007/125 · 31.8 mo to decide
10.2Operational2009-10-14
Scout Moor Windfarm
Munich Re (previously Peel) · 22.8 mo to decide
65Operational2005-05-25
Reaps Moss Wind Farm
S B ENERGY LTD · 8.7 mo to decide
9Revised2000-02-21
Hogshead Wind Farm
Renewable Energy Systems (RES) · 8.7 mo to decide
7.1Application Refused2000-02-21
Tooter Hill and Hogshead Hill
Renewable Energy Systems RES ltd (Beaufort) · 5.4 mo to decide
3Application Refused1999-06-15

Does Rossendale approve onshore wind schemes?

Yes — of the 5 onshore wind schemes Rossendale has decided, 40% were approved (2 granted, 3 refused). The UK-wide rate for onshore wind is 68%. Note this is a small caseload, so treat the percentage as indicative rather than statistically robust.

How long does a onshore wind scheme application take in Rossendale?

The median time from application to decision is 15.8 months, against a UK median of 11.5 months for onshore wind. That is measured between the submission and decision dates recorded in REPD, so it reflects the whole determination period including any extensions.

How much onshore wind capacity has Rossendale consented?

75 MW has been consented across 2 approved schemes, with 47 MW refused. A further 1 application awaits a decision.

Other technologies in Rossendale

Solar in RossendaleBattery storage in Rossendale

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0 — 2026 Q1 extract. Approval rate is over decided applications only (approved ÷ approved+refused); withdrawn and undecided schemes are excluded. A permission later expired still counts as approved because consent was granted. REPD covers schemes of roughly 150 kW and above, is published quarterly, and does not record refusal reasons — so nothing here explains why a scheme was refused. Screening context for site selection, not planning advice.