Crook Hill (Rochdale MBC) 2 of 2

Crook Hill (Rochdale MBC) 2 of 2 is operational in Rochdale with a recorded capacity of 23.8 MW, and has been generating since 2015-12-01.

23.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2015-12-01
Wind Onshore
Technology
Infrared Capital Partners
Rochdale
Authority
England

Planning and build timeline

Application submitted2008-07-10
Permission granted2009-07-31
13 months after submission
Operational2015-12-01
76 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Crook Hill (Calderdale MBC) 1 of 2
Wind Onshore · Operational
13.60.3 km
Todmorden Moor
Wind Onshore · Operational
12.34.4 km
Reaps Moss Wind Farm
Wind Onshore · Operational
10.24.8 km
Coal Clough Wind Farm
Wind Onshore · Operational
9.69.1 km
Coal Clough Wind Farm Repowering
Wind Onshore · Operational
169.1 km
Gipsy Lane
Battery · Under Construction
209.1 km
Astra Centre, Royal Barn Road - Energy Storage
Battery · Under Construction
409.3 km
Scout Moor Windfarm
Wind Onshore · Operational
6510.1 km

How big is Crook Hill (Rochdale MBC) 2 of 2?

Crook Hill (Rochdale MBC) 2 of 2 has a recorded installed capacity of 23.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Crook Hill (Rochdale MBC) 2 of 2?

REPD records the operator as Infrared Capital Partners. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Crook Hill (Rochdale MBC) 2 of 2 approved and built?

The application was submitted on 2008-07-10. Permission was granted on 2009-07-31, 13 months later. The site became operational on 2015-12-01, 76 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4659.