Novarly ParcelRenewable sites

Renewable sitesRossendale Power

Rossendale Power

Rossendale Power is operational in Rossendale with a recorded capacity of 1.6 MW, and has been generating since 2001-07-01.

1.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2001-07-01
Landfill Gas
Technology
Unknown
Rossendale
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2001-07-01

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Horncliffe Quarry
Landfill Gas · Operational
10 km
Horncliffe Quarry (Extension)
Landfill Gas · Operational
10 km
Scout Moor Windfarm
Wind Onshore · Operational
652.5 km
Hyndburn Wind Farm
Wind Onshore · Operational
247.1 km
Reaps Moss Wind Farm
Wind Onshore · Operational
10.28.6 km
Deerplay Landfill Site
Landfill Gas · Operational
28.9 km
Todmorden Moor
Wind Onshore · Operational
12.39.1 km
Lascar Works
Battery · Operational
209.7 km

How big is Rossendale Power?

Rossendale Power has a recorded installed capacity of 1.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Rossendale Power?

REPD records the operator as Unknown. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Rossendale Power approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2001-07-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 637.