Deerplay Landfill Site

Deerplay Landfill Site is operational in Burnley with a recorded capacity of 2 MW, and has been generating since 2006-05-24.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 2006-05-24
Landfill Gas
Technology
CAIRD ENVIRONMENTAL LTD
Burnley
Authority
England

Planning and build timeline

Application submitted2004-12-17
Permission granted2005-03-01
2 months after submission
Operational2006-05-24
15 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 5 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Coal Clough Wind Farm
Wind Onshore · Operational
9.64.6 km
Coal Clough Wind Farm Repowering
Wind Onshore · Operational
164.6 km
Rowley
Landfill Gas · Operational
1.95 km
Queen's Park Road Energy
Landfill Gas · Operational
1.85.2 km
Queens Park Energy
Landfill Gas · Operational
1.95.4 km
Widow Hill, Balderstone Lane - Battery Energy Storage System
Battery · Under Construction
706 km
New Barn Farm
Wind Onshore · Operational
4.56 km
Hameldon Hill extension
Wind Onshore · Operational
7.56.1 km

How big is Deerplay Landfill Site?

Deerplay Landfill Site has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Deerplay Landfill Site?

REPD records the operator as CAIRD ENVIRONMENTAL LTD. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Deerplay Landfill Site approved and built?

The application was submitted on 2004-12-17. Permission was granted on 2005-03-01, 2 months later. The site became operational on 2006-05-24, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 576.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council