Raf Honington Solar Farm
Raf Honington Solar Farm is under construction in West Suffolk.
Planning and build timeline
| Application submitted | 2021-01-21 |
| Permission granted | 2021-12-23 11 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Suffolk’s record on solar
West Suffolk has decided 29 solar farms and approved 97%, taking a median of 2.9 months. See every solar farm decision in West Suffolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Honington Solar Farm Solar Photovoltaics · Operational | 13.6 | 2.2 km |
Ingham North Solar Solar Photovoltaics · Operational | 14.2 | 7.4 km |
Thetford Biomass Power Station Biomass (dedicated) · Operational | 38.5 | 11.2 km |
British Sugar - Bury Anaerobic Digestion · Operational | 5 | 12.5 km |
Lackford Landfill Scheme Landfill Gas · Operational | 1.2 | 13.1 km |
Easlea Road - Solar Photovoltaic Panels Solar Photovoltaics · Operational | 0.62 | 13.7 km |
West Suffolk College, Out Risbygate Street - Solar Panels Solar Photovoltaics · Under Construction | 0.55 | 13.9 km |
Lackford Estate Solar Park Solar Photovoltaics · Operational | 20.9 | 14.9 km |
How big is Raf Honington Solar Farm?
REPD does not record an installed capacity for Raf Honington Solar Farm.
Who operates Raf Honington Solar Farm?
REPD records the operator as Euston Solar Farm Ltd Island Green Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Raf Honington Solar Farm approved and built?
The application was submitted on 2021-01-21. Permission was granted on 2021-12-23, 11 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 8424.