Renewable sites › Lackford Landfill Scheme
Lackford Landfill Scheme
Lackford Landfill Scheme is operational in West Suffolk with a recorded capacity of 1.2 MW, and has been generating since 2000-04-12.
Planning and build timeline
| Application submitted | 1999-08-24 |
| Permission granted | 1999-11-02 2 months after submission |
| Operational | 2000-04-12 5 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 4 agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Lackford Estate Solar Park Solar Photovoltaics · Operational | 20.9 | 1.9 km |
Symonds Farm Power Ltd (Farm AD) Anaerobic Digestion · Operational | 1.4 | 3.9 km |
Ingham North Solar Solar Photovoltaics · Operational | 14.2 | 5.8 km |
West Suffolk College, Out Risbygate Street - Solar Panels Solar Photovoltaics · Under Construction | 0.55 | 6.4 km |
British Sugar - Bury Anaerobic Digestion · Operational | 5 | 7.4 km |
Easlea Road - Solar Photovoltaic Panels Solar Photovoltaics · Operational | 0.62 | 9.3 km |
Bay Farm Solar Photovoltaics · Operational | 8.1 | 9.8 km |
Honington Solar Farm Solar Photovoltaics · Operational | 13.6 | 11.5 km |
How big is Lackford Landfill Scheme?
Lackford Landfill Scheme has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Lackford Landfill Scheme?
REPD records the operator as Gengas Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Lackford Landfill Scheme approved and built?
The application was submitted on 1999-08-24. Permission was granted on 1999-11-02, 2 months later. The site became operational on 2000-04-12, 5 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 508.