Renewable sitesEaslea Road - Solar Photovoltaic Panels

Easlea Road - Solar Photovoltaic Panels

Easlea Road - Solar Photovoltaic Panels is operational in West Suffolk with a recorded capacity of 0.62 MW, and has been generating since 2022-01-01.

0.62 MW
Capacity
as recorded in REPD
Operational
Status
since 2022-01-01
Solar Photovoltaics
Technology
Vitec Production Solutions
West Suffolk
Authority
England

Planning and build timeline

Application submitted2021-09-23
Permission granted2022-04-08
6 months after submission
Operational2022-01-01

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

West Suffolk’s record on solar

West Suffolk has decided 29 solar farms and approved 97%, taking a median of 2.9 months. See every solar farm decision in West Suffolk

Other built sites within 15 km

SiteMWDistance
British Sugar - Bury
Anaerobic Digestion · Operational
52 km
West Suffolk College, Out Risbygate Street - Solar Panels
Solar Photovoltaics · Under Construction
0.553.2 km
Symonds Farm Power Ltd (Farm AD)
Anaerobic Digestion · Operational
1.47.5 km
Ingham North Solar
Solar Photovoltaics · Operational
14.29.1 km
Lackford Landfill Scheme
Landfill Gas · Operational
1.29.3 km
Lackford Estate Solar Park
Solar Photovoltaics · Operational
20.910.6 km
Honington Solar Farm
Solar Photovoltaics · Operational
13.611.5 km
Raf Honington Solar Farm
Solar Photovoltaics · Under Construction
13.7 km

How big is Easlea Road - Solar Photovoltaic Panels?

Easlea Road - Solar Photovoltaic Panels has a recorded installed capacity of 0.62 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Easlea Road - Solar Photovoltaic Panels?

REPD records the operator as Vitec Production Solutions. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Easlea Road - Solar Photovoltaic Panels approved and built?

The application was submitted on 2021-09-23. Permission was granted on 2022-04-08, 6 months later. The site became operational on 2022-01-01.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 9767.