West Suffolk College, Out Risbygate Street - Solar Panels
West Suffolk College, Out Risbygate Street - Solar Panels is under construction in West Suffolk with a recorded capacity of 0.55 MW.
Planning and build timeline
| Application submitted | 2022-10-10 |
| Permission granted | 2022-12-05 2 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
West Suffolk’s record on solar
West Suffolk has decided 29 solar farms and approved 97%, taking a median of 2.9 months. See every solar farm decision in West Suffolk →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
British Sugar - Bury Anaerobic Digestion · Operational | 5 | 2 km |
Easlea Road - Solar Photovoltaic Panels Solar Photovoltaics · Operational | 0.62 | 3.2 km |
Symonds Farm Power Ltd (Farm AD) Anaerobic Digestion · Operational | 1.4 | 4.4 km |
Lackford Landfill Scheme Landfill Gas · Operational | 1.2 | 6.4 km |
Lackford Estate Solar Park Solar Photovoltaics · Operational | 20.9 | 7.5 km |
Ingham North Solar Solar Photovoltaics · Operational | 14.2 | 7.8 km |
Honington Solar Farm Solar Photovoltaics · Operational | 13.6 | 11.8 km |
Raf Honington Solar Farm Solar Photovoltaics · Under Construction | — | 13.9 km |
How big is West Suffolk College, Out Risbygate Street - Solar Panels?
West Suffolk College, Out Risbygate Street - Solar Panels has a recorded installed capacity of 0.55 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates West Suffolk College, Out Risbygate Street - Solar Panels?
REPD records the operator as West Suffolk College. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was West Suffolk College, Out Risbygate Street - Solar Panels approved and built?
The application was submitted on 2022-10-10. Permission was granted on 2022-12-05, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 12450.
Novarly Parcel · official public data, read properly · parcel.novarly.com