Renewable sites › Hampole Wind Farm
Hampole Wind Farm
Hampole Wind Farm is operational in Doncaster with a recorded capacity of 8 MW, and has been generating since 2014-03-31.
Planning and build timeline
| Application submitted | 2008-09-09 |
| Permission granted | 2009-12-17 15 months after submission |
| Operational | 2014-03-31 51 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- Green Belt — Doncaster
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Doncaster’s record on onshore wind
Doncaster has decided 5 onshore wind schemes and approved 80%, taking a median of 49.2 months. See every onshore wind scheme decision in Doncaster →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Elmsall Way Warehouse Solar Photovoltaics · Operational | 2.4 | 3 km |
Skelbrooke Landfill Gas Project Landfill Gas · Operational | 2.1 | 3 km |
Elmsall Way, South Elmsall - Solar Panels Solar Photovoltaics · Under Construction | 3 | 3.2 km |
Marr Windfarm Wind Onshore · Operational | 8 | 5 km |
Croft Farm, Askern Road - Solar Array & Hydrogen Plant Solar Photovoltaics · Under Construction | 2.5 | 5.2 km |
South Kirkby Business Park (Waste AD) Anaerobic Digestion · Operational | 6 | 6.4 km |
Goldthorpe Solar Photovoltaics · Operational | 1.5 | 6.6 km |
Askern Colliery solar farm Solar Photovoltaics · Operational | 5 | 8 km |
How big is Hampole Wind Farm?
Hampole Wind Farm has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Hampole Wind Farm?
REPD records the operator as Good Energy (previously nPower Renewables). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Hampole Wind Farm approved and built?
The application was submitted on 2008-09-09. Permission was granted on 2009-12-17, 15 months later. The site became operational on 2014-03-31, 51 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3957.
Novarly Parcel · official public data, read properly · parcel.novarly.com