Hampole Wind Farm

Hampole Wind Farm is an operational 8 MW onshore wind farm in Doncaster, generating since 31 March 2014. Planning permission was granted on 17 December 2009, 15 months after submission. Operator of record: Good Energy (previously nPower Renewables).

8 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2014
Wind Onshore
Technology
Good Energy (previously nPower Renewables)
Doncaster
Authority
England

Planning and build timeline

Application submitted9 September 2008
Permission granted17 December 2009
15 months after submission
Operational31 March 2014
51 months after consent

Screening a site of your own?

RedlineUK · £39

Doncaster approves 80% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Hampole Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Doncaster’s record on onshore wind

Doncaster has decided 5 onshore wind schemes and approved 80%, taking a median of 49.2 months. See every onshore wind scheme decision in Doncaster

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
2.43 km
Landfill Gas · Operational
2.13 km
Solar Photovoltaics · Under Construction
33.2 km
Wind Onshore · Operational
85 km
Solar Photovoltaics · Under Construction
2.55.2 km
Anaerobic Digestion · Operational
66.4 km
Solar Photovoltaics · Operational
1.56.6 km
Solar Photovoltaics · Operational
58 km

How big is Hampole Wind Farm?

Hampole Wind Farm has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Hampole Wind Farm?

REPD records the operator as Good Energy (previously nPower Renewables). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Hampole Wind Farm approved and built?

The application was submitted on 9 September 2008. Permission was granted on 17 December 2009, 15 months later. The site became operational on 31 March 2014, 51 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3957.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode