Renewable sites › Princes Gate Spring Water
Princes Gate Spring Water
Princes Gate Spring Water is an operational 1.6 MW onshore wind farm in Pembrokeshire, generating since 3 September 2014. Planning permission was granted on 9 July 2013, 20 months after submission. Operator of record: Princes Gate Spring Water.
Planning and build timeline
| Application submitted | 18 November 2011 |
| Permission granted | 9 July 2013 20 months after submission |
| Operational | 3 September 2014 14 months after consent |
Screening a site of your own?
Pembrokeshire approves 47% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Princes Gate Spring Water’s recorded coordinate — swap in your own postcode or coordinates.
Pembrokeshire’s record on onshore wind
Pembrokeshire has decided 15 onshore wind schemes and approved 47%, taking a median of 8 months. See every onshore wind scheme decision in Pembrokeshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 18 | 7.1 km |
Anaerobic Digestion · Under Construction | 1 | 7.4 km |
Solar Photovoltaics · Operational | 6.1 | 8.1 km |
Solar Photovoltaics · Operational | 5 | 10.5 km |
Wind Onshore · Operational | 8.4 | 10.5 km |
Wind Onshore · Operational | 3.6 | 10.8 km |
Solar Photovoltaics · Operational | 2.5 | 12 km |
Solar Photovoltaics · Operational | 5 | 13.2 km |
How big is Princes Gate Spring Water?
Princes Gate Spring Water has a recorded installed capacity of 1.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Princes Gate Spring Water?
REPD records the operator as Princes Gate Spring Water. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Princes Gate Spring Water approved and built?
The application was submitted on 18 November 2011. Permission was granted on 9 July 2013, 20 months later. The site became operational on 3 September 2014, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3378.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode