Renewable sites › Parc Cynog Extension
Parc Cynog Extension
Parc Cynog Extension is an operational 8.4 MW onshore wind farm in Carmarthenshire, generating since 1 November 2009. Planning permission was granted on 19 July 2007, 17 months after submission. Operator of record: Nuon.
Planning and build timeline
| Application submitted | 2 February 2006 |
| Permission granted | 19 July 2007 17 months after submission |
| Operational | 1 November 2009 27 months after consent |
Screening a site of your own?
Carmarthenshire approves 70% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Parc Cynog Extension’s recorded coordinate — swap in your own postcode or coordinates.
Carmarthenshire’s record on onshore wind
Carmarthenshire has decided 10 onshore wind schemes and approved 70%, taking a median of 11.7 months. See every onshore wind scheme decision in Carmarthenshire →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 5 | 0 km |
Wind Onshore · Operational | 3.6 | 0.4 km |
Solar Photovoltaics · Operational | 18 | 10.3 km |
Wind Onshore · Operational | 1.6 | 10.5 km |
How big is Parc Cynog Extension?
Parc Cynog Extension has a recorded installed capacity of 8.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Parc Cynog Extension?
REPD records the operator as Nuon. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Parc Cynog Extension approved and built?
The application was submitted on 2 February 2006. Permission was granted on 19 July 2007, 17 months later. The site became operational on 1 November 2009, 27 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2950.