Novarly ParcelRenewable sites

Renewable sitesLangdon Mill

Langdon Mill

Langdon Mill is a 1 MW anaerobic digestion plant under construction in Pembrokeshire. Planning permission was granted on 11 December 2015, 4 months after submission. Operator of record: Langdon Enterprises.

1 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Anaerobic Digestion
Technology
Langdon Enterprises
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted3 August 2015
Permission granted11 December 2015
4 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Pembrokeshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Langdon Mill’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
6.12 km
Solar Photovoltaics · Operational
56.8 km
Solar Photovoltaics · Operational
2.57.3 km
Wind Onshore · Operational
1.67.4 km
Solar Photovoltaics · Under Construction
99.6 km
Solar Photovoltaics · Operational
7.79.7 km
Solar Photovoltaics · Operational
6.210.8 km
Solar Photovoltaics · Operational
4.911.6 km

How big is Langdon Mill?

Langdon Mill has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Langdon Mill?

REPD records the operator as Langdon Enterprises. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Langdon Mill approved and built?

The application was submitted on 3 August 2015. Permission was granted on 11 December 2015, 4 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5747.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode