Langdon Mill
Langdon Mill is a 1 MW anaerobic digestion plant under construction in Pembrokeshire. Planning permission was granted on 11 December 2015, 4 months after submission. Operator of record: Langdon Enterprises.
Planning and build timeline
| Application submitted | 3 August 2015 |
| Permission granted | 11 December 2015 4 months after submission |
| Operational | not recorded |
Screening a site of your own?
Redline runs the record on your own boundary in Pembrokeshire: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Langdon Mill’s recorded coordinate — swap in your own postcode or coordinates.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 6.1 | 2 km |
Solar Photovoltaics · Operational | 5 | 6.8 km |
Solar Photovoltaics · Operational | 2.5 | 7.3 km |
Wind Onshore · Operational | 1.6 | 7.4 km |
Solar Photovoltaics · Under Construction | 9 | 9.6 km |
Solar Photovoltaics · Operational | 7.7 | 9.7 km |
Solar Photovoltaics · Operational | 6.2 | 10.8 km |
Solar Photovoltaics · Operational | 4.9 | 11.6 km |
How big is Langdon Mill?
Langdon Mill has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Langdon Mill?
REPD records the operator as Langdon Enterprises. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Langdon Mill approved and built?
The application was submitted on 3 August 2015. Permission was granted on 11 December 2015, 4 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5747.