Jordanston Solar Farm is an operational 5 MW solar farm in Pembrokeshire, generating since 28 March 2013. Planning permission was granted on 26 September 2012, 3 months after submission. Operator of record: AEE Renewables.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 28 March 2013
Solar Photovoltaics
Technology
AEE Renewables
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted28 June 2012
Permission granted26 September 2012
3 months after submission
Operational28 March 2013
6 months after consent

Screening a site of your own?

RedlineUK · £39

Pembrokeshire approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Jordanston Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Pembrokeshire’s record on solar

Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
2.53.5 km
Anaerobic Digestion · Under Construction
16.8 km
Solar Photovoltaics · Under Construction
97.5 km
Solar Photovoltaics · Operational
7.77.7 km
Solar Photovoltaics · Operational
6.27.8 km
Solar Photovoltaics · Operational
6.18 km
Solar Photovoltaics · Operational
811.2 km
Wind Onshore · Operational
1.613.2 km

How big is Jordanston Solar Farm?

Jordanston Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Jordanston Solar Farm?

REPD records the operator as AEE Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Jordanston Solar Farm approved and built?

The application was submitted on 28 June 2012. Permission was granted on 26 September 2012, 3 months later. The site became operational on 28 March 2013, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1388.