Novarly ParcelRenewable sites

Renewable sitesJordanston Solar Farm

Jordanston Solar Farm

Jordanston Solar Farm is operational in Pembrokeshire with a recorded capacity of 5 MW, and has been generating since 2013-03-28.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2013-03-28
Solar Photovoltaics
Technology
AEE Renewables
Pembrokeshire
Authority
Wales

Planning and build timeline

Application submitted2012-06-28
Permission granted2012-09-26
3 months after submission
Operational2013-03-28
6 months after consent

Pembrokeshire’s record on solar

Pembrokeshire has decided 30 solar farms and approved 100%, taking a median of 4.6 months. See every solar farm decision in Pembrokeshire

Other built sites within 15 km

SiteMWDistance
Land West of Roberts Wall Far
Solar Photovoltaics · Operational
2.53.5 km
Langdon Mill
Anaerobic Digestion · Under Construction
16.8 km
West Farm, Cosheston - Solar Farm
Solar Photovoltaics · Under Construction
97.5 km
West Farm (Solar)
Solar Photovoltaics · Operational
7.77.7 km
Golden Hill
Solar Photovoltaics · Operational
6.27.8 km
Yerbeston Gate Farm
Solar Photovoltaics · Operational
6.18 km
Chapel Hill
Solar Photovoltaics · Operational
811.2 km
Princes Gate Spring Water
Wind Onshore · Operational
1.613.2 km

How big is Jordanston Solar Farm?

Jordanston Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Jordanston Solar Farm?

REPD records the operator as AEE Renewables. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Jordanston Solar Farm approved and built?

The application was submitted on 2012-06-28. Permission was granted on 2012-09-26, 3 months later. The site became operational on 2013-03-28, 6 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1388.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council