Parc-Cynog Wind Farm is operational in Carmarthenshire with a recorded capacity of 3.6 MW, and has been generating since 2001-02-01.

3.6 MW
Capacity
as recorded in REPD
Operational
Status
since 2001-02-01
Wind Onshore
Technology
Micon Wind Turbines (UK) Limited
Carmarthenshire
Authority
Wales

Planning and build timeline

Application submitted1998-05-05
Permission granted2000-02-01
21 months after submission
Operational2001-02-01
12 months after consent

Carmarthenshire’s record on onshore wind

Carmarthenshire has decided 10 onshore wind schemes and approved 70%, taking a median of 11.7 months. See every onshore wind scheme decision in Carmarthenshire

Other built sites within 15 km

SiteMWDistance
Parc Cynog Extension
Wind Onshore · Operational
8.40.4 km
Parc Cynog
Solar Photovoltaics · Operational
50.4 km
Caeremlyn Solar Farm
Solar Photovoltaics · Operational
1810.7 km
Princes Gate Spring Water
Wind Onshore · Operational
1.610.8 km

How big is Parc-Cynog Wind Farm?

Parc-Cynog Wind Farm has a recorded installed capacity of 3.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Parc-Cynog Wind Farm?

REPD records the operator as Micon Wind Turbines (UK) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Parc-Cynog Wind Farm approved and built?

The application was submitted on 1998-05-05. Permission was granted on 2000-02-01, 21 months later. The site became operational on 2001-02-01, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2636.