Novarly ParcelRenewable sites

Renewable sitesParc-Cynog Wind Farm

Parc-Cynog Wind Farm

Parc-Cynog Wind Farm is an operational 3.6 MW onshore wind farm in Carmarthenshire, generating since 1 February 2001. Planning permission was granted on 1 February 2000, 21 months after submission. Operator of record: Micon Wind Turbines (UK) Limited.

3.6 MW
Capacity
as recorded in REPD
Operational
Status
since 1 February 2001
Wind Onshore
Technology
Micon Wind Turbines (UK) Limited
Carmarthenshire
Authority
Wales

Planning and build timeline

Application submitted5 May 1998
Permission granted1 February 2000
21 months after submission
Operational1 February 2001
12 months after consent

Screening a site of your own?

RedlineUK · £39

Carmarthenshire approves 70% of onshore wind schemes. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Parc-Cynog Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Carmarthenshire’s record on onshore wind

Carmarthenshire has decided 10 onshore wind schemes and approved 70%, taking a median of 11.7 months. See every onshore wind scheme decision in Carmarthenshire

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
8.40.4 km
Solar Photovoltaics · Operational
50.4 km
Solar Photovoltaics · Operational
1810.7 km
Wind Onshore · Operational
1.610.8 km

How big is Parc-Cynog Wind Farm?

Parc-Cynog Wind Farm has a recorded installed capacity of 3.6 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Parc-Cynog Wind Farm?

REPD records the operator as Micon Wind Turbines (UK) Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Parc-Cynog Wind Farm approved and built?

The application was submitted on 5 May 1998. Permission was granted on 1 February 2000, 21 months later. The site became operational on 1 February 2001, 12 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2636.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode