Novarly ParcelRenewable sites

Renewable sitesPotters Bar Solar Farm

Potters Bar Solar Farm

Potters Bar Solar Farm is operational in Hertsmere with a recorded capacity of 5 MW, and has been generating since 2017-03-28.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-28
Solar Photovoltaics
Technology
UK Sustainable Energy
Hertsmere
Authority
England

Planning and build timeline

Application submitted2015-09-03
Permission granted2015-12-18
3 months after submission
Operational2017-03-28
15 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hertsmere’s record on solar

Hertsmere has decided 13 solar farms and approved 92%, taking a median of 1.8 months. See every solar farm decision in Hertsmere

Other built sites within 15 km

SiteMWDistance
Land At Swanland Road
Solar Photovoltaics · Operational
51.8 km
Blanche Lane, South Mimms - Solar Panels
Solar Photovoltaics · Under Construction
0.613.4 km
Tollgate Farm Battery Storage
Battery · Under Construction
49.53.7 km
Coursers Farm AD Plant (Waste AD)
Anaerobic Digestion · Operational
34.1 km
Cattlegate Farm Biogas (Farm AD)
Anaerobic Digestion · Operational
1.56.6 km
Elstree Film And TV Studios, Shenley Road - Solar Panels
Solar Photovoltaics · Operational
37.3 km
Aylett Nurseries - Solar Panels
Solar Photovoltaics · Operational
7.6 km
Computacenter Warehouse
Solar Photovoltaics · Under Construction
27.8 km

How big is Potters Bar Solar Farm?

Potters Bar Solar Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Potters Bar Solar Farm?

REPD records the operator as UK Sustainable Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Potters Bar Solar Farm approved and built?

The application was submitted on 2015-09-03. Permission was granted on 2015-12-18, 3 months later. The site became operational on 2017-03-28, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5660.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council