Renewable sites › Elstree Film And TV Studios, Shenley Road - Solar Panels
Elstree Film And TV Studios, Shenley Road - Solar Panels
Elstree Film And TV Studios, Shenley Road - Solar Panels is operational in Hertsmere with a recorded capacity of 3 MW, and has been generating since 2023-09-05.
Planning and build timeline
| Application submitted | 2023-02-24 |
| Permission granted | not recorded |
| Operational | 2023-09-05 |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Hertsmere’s record on solar
Hertsmere has decided 13 solar farms and approved 92%, taking a median of 1.8 months. See every solar farm decision in Hertsmere →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Blanche Lane, South Mimms - Solar Panels Solar Photovoltaics · Under Construction | 0.61 | 4 km |
Land At Swanland Road Solar Photovoltaics · Operational | 5 | 5.4 km |
Potters Bar Solar Farm Solar Photovoltaics · Operational | 5 | 7.3 km |
Coursers Farm AD Plant (Waste AD) Anaerobic Digestion · Operational | 3 | 7.7 km |
Aylett Nurseries - Solar Panels Solar Photovoltaics · Operational | — | 8.6 km |
Tollgate Farm Battery Storage Battery · Under Construction | 49.5 | 8.9 km |
Woodside Leisure Centre - Solar PV Panels Solar Photovoltaics · Operational | 0.29 | 9.5 km |
Cattlegate Farm Biogas (Farm AD) Anaerobic Digestion · Operational | 1.5 | 11.7 km |
How big is Elstree Film And TV Studios, Shenley Road - Solar Panels?
Elstree Film And TV Studios, Shenley Road - Solar Panels has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Elstree Film And TV Studios, Shenley Road - Solar Panels?
REPD records the operator as Sky Studios. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Elstree Film And TV Studios, Shenley Road - Solar Panels approved and built?
The application was submitted on 2023-02-24. REPD does not record a grant date. The site became operational on 2023-09-05.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14774.
Novarly Parcel · official public data, read properly · parcel.novarly.com