Elstree Film And TV Studios, Shenley Road - Solar Panels is operational in Hertsmere with a recorded capacity of 3 MW, and has been generating since 2023-09-05.

3 MW
Capacity
as recorded in REPD
Operational
Status
since 2023-09-05
Solar Photovoltaics
Technology
Sky Studios
Hertsmere
Authority
England

Planning and build timeline

Application submitted2023-02-24
Permission grantednot recorded
Operational2023-09-05

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hertsmere’s record on solar

Hertsmere has decided 13 solar farms and approved 92%, taking a median of 1.8 months. See every solar farm decision in Hertsmere

Other built sites within 15 km

SiteMWDistance
Blanche Lane, South Mimms - Solar Panels
Solar Photovoltaics · Under Construction
0.614 km
Land At Swanland Road
Solar Photovoltaics · Operational
55.4 km
Potters Bar Solar Farm
Solar Photovoltaics · Operational
57.3 km
Coursers Farm AD Plant (Waste AD)
Anaerobic Digestion · Operational
37.7 km
Aylett Nurseries - Solar Panels
Solar Photovoltaics · Operational
8.6 km
Tollgate Farm Battery Storage
Battery · Under Construction
49.58.9 km
Woodside Leisure Centre - Solar PV Panels
Solar Photovoltaics · Operational
0.299.5 km
Cattlegate Farm Biogas (Farm AD)
Anaerobic Digestion · Operational
1.511.7 km

How big is Elstree Film And TV Studios, Shenley Road - Solar Panels?

Elstree Film And TV Studios, Shenley Road - Solar Panels has a recorded installed capacity of 3 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Elstree Film And TV Studios, Shenley Road - Solar Panels?

REPD records the operator as Sky Studios. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Elstree Film And TV Studios, Shenley Road - Solar Panels approved and built?

The application was submitted on 2023-02-24. REPD does not record a grant date. The site became operational on 2023-09-05.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14774.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council