Novarly ParcelRenewable sites

Renewable sitesComputacenter Warehouse

Computacenter Warehouse

Computacenter Warehouse is a 2 MW solar farm under construction in Welwyn Hatfield. Planning permission was granted on 8 March 2019, 1 months after submission. Operator of record: Computacenter UK.

2 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Computacenter UK
Welwyn Hatfield
Authority
England

Planning and build timeline

Application submitted29 January 2019
Permission granted8 March 2019
1 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Welwyn Hatfield approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Computacenter Warehouse’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Non Agricultural agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Welwyn Hatfield’s record on solar

Welwyn Hatfield has decided 7 solar farms and approved 100%, taking a median of 1.8 months. See every solar farm decision in Welwyn Hatfield

Other built sites within 15 km

SiteMWDistance
Battery · Under Construction
49.54.4 km
Anaerobic Digestion · Operational
35.3 km
Solar Photovoltaics · Operational
6.6 km
Solar Photovoltaics · Operational
57.8 km
Solar Photovoltaics · Operational
58.8 km
Solar Photovoltaics · Under Construction
0.619.5 km
Solar Photovoltaics · Operational
512.2 km
Anaerobic Digestion · Operational
1.512.7 km

How big is Computacenter Warehouse?

Computacenter Warehouse has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Computacenter Warehouse?

REPD records the operator as Computacenter UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Computacenter Warehouse approved and built?

The application was submitted on 29 January 2019. Permission was granted on 8 March 2019, 1 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 7290.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode