Novarly ParcelRenewable sites

Renewable sitesBlanche Lane, South Mimms - Solar Panels

Blanche Lane, South Mimms - Solar Panels

Blanche Lane, South Mimms - Solar Panels is a 0.61 MW solar farm under construction in Hertsmere. Planning permission was granted on 23 August 2023, 14 months after submission. Operator of record: Private Developer.

0.61 MW
Capacity
as recorded in REPD
Under Construction
Status
no operational date
Solar Photovoltaics
Technology
Private Developer
Hertsmere
Authority
England

Planning and build timeline

Application submitted10 June 2022
Permission granted23 August 2023
14 months after submission
Operationalnot recorded

Screening a site of your own?

RedlineUK · £39

Hertsmere approves 92% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Blanche Lane, South Mimms - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Hertsmere’s record on solar

Hertsmere has decided 13 solar farms and approved 92%, taking a median of 1.8 months. See every solar farm decision in Hertsmere

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
51.6 km
Solar Photovoltaics · Operational
53.4 km
Solar Photovoltaics · Operational
34 km
Anaerobic Digestion · Operational
34.4 km
Battery · Under Construction
49.55.2 km
Solar Photovoltaics · Operational
6.7 km
Anaerobic Digestion · Operational
1.59 km
Solar Photovoltaics · Under Construction
29.5 km

How big is Blanche Lane, South Mimms - Solar Panels?

Blanche Lane, South Mimms - Solar Panels has a recorded installed capacity of 0.61 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Blanche Lane, South Mimms - Solar Panels?

REPD records the operator as Private Developer. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Blanche Lane, South Mimms - Solar Panels approved and built?

The application was submitted on 10 June 2022. Permission was granted on 23 August 2023, 14 months later. The site is recorded as under construction and has no operational date yet.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 11499.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode