Renewable sitesAylett Nurseries - Solar Panels

Aylett Nurseries - Solar Panels

Aylett Nurseries - Solar Panels is operational in St Albans, and has been generating since 2023-08-10.

Capacity
as recorded in REPD
Operational
Status
since 2023-08-10
Solar Photovoltaics
Technology
Aylett Nurseries
St Albans
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational2023-08-10

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

St Albans’s record on solar

St Albans has decided 10 solar farms and approved 100%, taking a median of 1.6 months. See every solar farm decision in St Albans

Other built sites within 15 km

SiteMWDistance
Coursers Farm AD Plant (Waste AD)
Anaerobic Digestion · Operational
33.6 km
Tollgate Farm Battery Storage
Battery · Under Construction
49.55 km
Computacenter Warehouse
Solar Photovoltaics · Under Construction
26.6 km
Blanche Lane, South Mimms - Solar Panels
Solar Photovoltaics · Under Construction
0.616.7 km
Woodside Leisure Centre - Solar PV Panels
Solar Photovoltaics · Operational
0.297 km
Land At Swanland Road
Solar Photovoltaics · Operational
57.1 km
Potters Bar Solar Farm
Solar Photovoltaics · Operational
57.6 km
Elstree Film And TV Studios, Shenley Road - Solar Panels
Solar Photovoltaics · Operational
38.6 km

How big is Aylett Nurseries - Solar Panels?

REPD does not record an installed capacity for Aylett Nurseries - Solar Panels.

Who operates Aylett Nurseries - Solar Panels?

REPD records the operator as Aylett Nurseries. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Aylett Nurseries - Solar Panels approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2023-08-10.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14593.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council