Renewable sites › Aylett Nurseries - Solar Panels
Aylett Nurseries - Solar Panels
Aylett Nurseries - Solar Panels is operational in St Albans, and has been generating since 2023-08-10.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 2023-08-10 |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — St Albans
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
St Albans’s record on solar
St Albans has decided 10 solar farms and approved 100%, taking a median of 1.6 months. See every solar farm decision in St Albans →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Coursers Farm AD Plant (Waste AD) Anaerobic Digestion · Operational | 3 | 3.6 km |
Tollgate Farm Battery Storage Battery · Under Construction | 49.5 | 5 km |
Computacenter Warehouse Solar Photovoltaics · Under Construction | 2 | 6.6 km |
Blanche Lane, South Mimms - Solar Panels Solar Photovoltaics · Under Construction | 0.61 | 6.7 km |
Woodside Leisure Centre - Solar PV Panels Solar Photovoltaics · Operational | 0.29 | 7 km |
Land At Swanland Road Solar Photovoltaics · Operational | 5 | 7.1 km |
Potters Bar Solar Farm Solar Photovoltaics · Operational | 5 | 7.6 km |
Elstree Film And TV Studios, Shenley Road - Solar Panels Solar Photovoltaics · Operational | 3 | 8.6 km |
How big is Aylett Nurseries - Solar Panels?
REPD does not record an installed capacity for Aylett Nurseries - Solar Panels.
Who operates Aylett Nurseries - Solar Panels?
REPD records the operator as Aylett Nurseries. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Aylett Nurseries - Solar Panels approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 2023-08-10.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14593.
Novarly Parcel · official public data, read properly · parcel.novarly.com