Aylett Nurseries - Solar Panels is an operational solar farm in St Albans, generating since 10 August 2023. REPD does not record the planning grant date. Operator of record: Aylett Nurseries.

Capacity
as recorded in REPD
Operational
Status
since 10 August 2023
Solar Photovoltaics
Technology
Aylett Nurseries
St Albans
Authority
England

Planning and build timeline

Application submittednot recorded
Permission grantednot recorded
Operational10 August 2023

Screening a site of your own?

RedlineUK · £39

St Albans approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Aylett Nurseries - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

St Albans’s record on solar

St Albans has decided 10 solar farms and approved 100%, taking a median of 1.6 months. See every solar farm decision in St Albans

Other built sites within 15 km

SiteMWDistance
Anaerobic Digestion · Operational
33.6 km
Battery · Under Construction
49.55 km
Solar Photovoltaics · Under Construction
26.6 km
Solar Photovoltaics · Under Construction
0.616.7 km
Solar Photovoltaics · Operational
0.297 km
Solar Photovoltaics · Operational
57.1 km
Solar Photovoltaics · Operational
57.6 km
Solar Photovoltaics · Operational
38.6 km

How big is Aylett Nurseries - Solar Panels?

REPD does not record an installed capacity for Aylett Nurseries - Solar Panels.

Who operates Aylett Nurseries - Solar Panels?

REPD records the operator as Aylett Nurseries. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Aylett Nurseries - Solar Panels approved and built?

REPD does not record a submission date. REPD does not record a grant date. The site became operational on 10 August 2023.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14593.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode