Renewable sites › Aylett Nurseries - Solar Panels
Aylett Nurseries - Solar Panels
Aylett Nurseries - Solar Panels is an operational solar farm in St Albans, generating since 10 August 2023. REPD does not record the planning grant date. Operator of record: Aylett Nurseries.
Planning and build timeline
| Application submitted | not recorded |
| Permission granted | not recorded |
| Operational | 10 August 2023 |
Screening a site of your own?
St Albans approves 100% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Aylett Nurseries - Solar Panels’s recorded coordinate — swap in your own postcode or coordinates.
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
- Green Belt — St Albans
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
St Albans’s record on solar
St Albans has decided 10 solar farms and approved 100%, taking a median of 1.6 months. See every solar farm decision in St Albans →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Anaerobic Digestion · Operational | 3 | 3.6 km |
Battery · Under Construction | 49.5 | 5 km |
Solar Photovoltaics · Under Construction | 2 | 6.6 km |
Solar Photovoltaics · Under Construction | 0.61 | 6.7 km |
Solar Photovoltaics · Operational | 0.29 | 7 km |
Solar Photovoltaics · Operational | 5 | 7.1 km |
Solar Photovoltaics · Operational | 5 | 7.6 km |
Solar Photovoltaics · Operational | 3 | 8.6 km |
How big is Aylett Nurseries - Solar Panels?
REPD does not record an installed capacity for Aylett Nurseries - Solar Panels.
Who operates Aylett Nurseries - Solar Panels?
REPD records the operator as Aylett Nurseries. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Aylett Nurseries - Solar Panels approved and built?
REPD does not record a submission date. REPD does not record a grant date. The site became operational on 10 August 2023.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 14593.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode