Renewable sites › PG4 St Bedes Power Generation (Extension 2)
PG4 St Bedes Power Generation (Extension 2)
PG4 St Bedes Power Generation (Extension 2) is operational in County Durham with a recorded capacity of 1 MW, and has been generating since 2003-10-02.
Planning and build timeline
| Application submitted | 2003-01-08 |
| Permission granted | 2003-06-06 5 months after submission |
| Operational | 2003-10-02 4 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Urban agricultural land.
- Green Belt — County Durham
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
PG4 St Bedes Power Generation Landfill Gas · Operational | 2 | 0.1 km |
PG4 St Bedes Power Generation (Extension) Landfill Gas · Operational | 2 | 0.2 km |
Kibblesworth Landfill Site Landfill Gas · Operational | 2.3 | 1.8 km |
Lumley Water Treatment Works - Solar Panels Solar Photovoltaics · Operational | 1.9 | 6.4 km |
Unipres building Solar Photovoltaics · Operational | 4.9 | 7.1 km |
Nissan Wind Farm Wind Onshore · Operational | 4 | 7.2 km |
Nissan Motors Plant Extn Wind Onshore · Operational | 2 | 7.2 km |
Sedgeletch Sewage Treatment Works Solar Photovoltaics · Under Construction | — | 7.2 km |
How big is PG4 St Bedes Power Generation (Extension 2)?
PG4 St Bedes Power Generation (Extension 2) has a recorded installed capacity of 1 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates PG4 St Bedes Power Generation (Extension 2)?
REPD records the operator as Natural Power. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was PG4 St Bedes Power Generation (Extension 2) approved and built?
The application was submitted on 2003-01-08. Permission was granted on 2003-06-06, 5 months later. The site became operational on 2003-10-02, 4 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 663.
Novarly Parcel · official public data, read properly · parcel.novarly.com