Nissan Wind Farm is an operational 4 MW onshore wind farm in Sunderland, generating since 1 November 2005. Planning permission was granted on 1 August 2005, 9 months after submission. Operator of record: Nissan Manufacturing UK.

4 MW
Capacity
as recorded in REPD
Operational
Status
since 1 November 2005
Wind Onshore
Technology
Nissan Manufacturing UK
Sunderland
Authority
England

Planning and build timeline

Application submitted20 October 2004
Permission granted1 August 2005
9 months after submission
Operational1 November 2005
3 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in Sunderland: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Nissan Wind Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Wind Onshore · Operational
20 km
Solar Photovoltaics · Operational
4.90.5 km
Solar Photovoltaics · Operational
4.81.2 km
Solar Photovoltaics · Under Construction
7 km
Landfill Gas · Operational
17.2 km
Battery · Operational
357.2 km
Landfill Gas · Operational
27.3 km
Landfill Gas · Operational
27.4 km

How big is Nissan Wind Farm?

Nissan Wind Farm has a recorded installed capacity of 4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Nissan Wind Farm?

REPD records the operator as Nissan Manufacturing UK. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Nissan Wind Farm approved and built?

The application was submitted on 20 October 2004. Permission was granted on 1 August 2005, 9 months later. The site became operational on 1 November 2005, 3 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2944.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode