Renewable sites › Nissan Motors Plant Extn
Nissan Motors Plant Extn
Nissan Motors Plant Extn is operational in Sunderland with a recorded capacity of 2 MW, and has been generating since 2008-04-01.
Planning and build timeline
| Application submitted | 2007-06-01 |
| Permission granted | 2007-07-31 2 months after submission |
| Operational | 2008-04-01 8 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Nissan Wind Farm Wind Onshore · Operational | 4 | 0 km |
Unipres building Solar Photovoltaics · Operational | 4.9 | 0.5 km |
Nissan Test Track Solar Photovoltaics · Operational | 4.8 | 1.2 km |
Sedgeletch Sewage Treatment Works Solar Photovoltaics · Under Construction | — | 7 km |
PG4 St Bedes Power Generation (Extension 2) Landfill Gas · Operational | 1 | 7.2 km |
Port of Tyne Battery · Operational | 35 | 7.2 km |
PG4 St Bedes Power Generation Landfill Gas · Operational | 2 | 7.3 km |
PG4 St Bedes Power Generation (Extension) Landfill Gas · Operational | 2 | 7.4 km |
How big is Nissan Motors Plant Extn?
Nissan Motors Plant Extn has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Nissan Motors Plant Extn?
REPD records the operator as TNEI Services Ltd. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Nissan Motors Plant Extn approved and built?
The application was submitted on 2007-06-01. Permission was granted on 2007-07-31, 2 months later. The site became operational on 2008-04-01, 8 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3964.