Renewable sitesPG4 St Bedes Power Generation (Extension)

PG4 St Bedes Power Generation (Extension)

PG4 St Bedes Power Generation (Extension) is an operational 2 MW landfill gas site in County Durham, generating since 18 July 2002. Planning permission was granted on 21 February 2002, 4 months after submission. Operator of record: DURHAM COUNTY WASTE MANAGEMENT LTD.

2 MW
Capacity
as recorded in REPD
Operational
Status
since 18 July 2002
Landfill Gas
Technology
DURHAM COUNTY WASTE MANAGEMENT LTD
County Durham
Authority
England

Planning and build timeline

Application submitted26 October 2001
Permission granted21 February 2002
4 months after submission
Operational18 July 2002
5 months after consent

Screening a site of your own?

RedlineUK · £39

Redline runs the record on your own boundary in County Durham: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with PG4 St Bedes Power Generation (Extension)’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar, battery or onshore wind scheme in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

What this site sits on

The recorded coordinate falls on land surveyed as Urban agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Landfill Gas · Operational
20.1 km
Landfill Gas · Operational
10.2 km
Landfill Gas · Operational
2.31.6 km
Solar Photovoltaics · Operational
1.96.5 km
Solar Photovoltaics · Operational
4.97.3 km
Wind Onshore · Operational
27.4 km
Wind Onshore · Operational
47.4 km
Solar Photovoltaics · Under Construction
7.4 km

How big is PG4 St Bedes Power Generation (Extension)?

PG4 St Bedes Power Generation (Extension) has a recorded installed capacity of 2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates PG4 St Bedes Power Generation (Extension)?

REPD records the operator as DURHAM COUNTY WASTE MANAGEMENT LTD. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was PG4 St Bedes Power Generation (Extension) approved and built?

The application was submitted on 26 October 2001. Permission was granted on 21 February 2002, 4 months later. The site became operational on 18 July 2002, 5 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 660.