Renewable sites › Sedgeletch Sewage Treatment Works
Sedgeletch Sewage Treatment Works
Sedgeletch Sewage Treatment Works is under construction in Sunderland.
Planning and build timeline
| Application submitted | 2020-11-12 |
| Permission granted | 2021-01-19 2 months after submission |
| Operational | not recorded |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 3 agricultural land. The published survey does not split Grade 3 into 3a and 3b, so this alone does not settle whether the land counts as best and most versatile.
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
Sunderland’s record on solar
Sunderland has decided 26 solar farms and approved 92%, taking a median of 1.9 months. See every solar farm decision in Sunderland →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Houghton-le-Spring Landfill Site Landfill Gas · Operational | 3 | 3 km |
Lumley Water Treatment Works - Solar Panels Solar Photovoltaics · Operational | 1.9 | 3.2 km |
Mark's Quarry Landfill Gas · Operational | 1 | 4.5 km |
Great Eppleton Farm Repowering Wind Onshore · Operational | 8.2 | 5.2 km |
Great Eppleton Wind Farm Wind Onshore · Operational | 3 | 5.2 km |
South Sharpley Wind Farm (Revised) Wind Onshore · Operational | 7.5 | 6.2 km |
Nissan Motors Plant Extn Wind Onshore · Operational | 2 | 7 km |
Nissan Wind Farm Wind Onshore · Operational | 4 | 7 km |
How big is Sedgeletch Sewage Treatment Works?
REPD does not record an installed capacity for Sedgeletch Sewage Treatment Works.
Who operates Sedgeletch Sewage Treatment Works?
REPD records the operator as Northumbrian Water Limited / Push Energy. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Sedgeletch Sewage Treatment Works approved and built?
The application was submitted on 2020-11-12. Permission was granted on 2021-01-19, 2 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6669.