Renewable sitesLoscar Farm

Loscar Farm

Loscar Farm is operational in Rotherham with a recorded capacity of 4.5 MW, and has been generating since 2011-01-01.

4.5 MW
Capacity
as recorded in REPD
Operational
Status
since 2011-01-01
Wind Onshore
Technology
REG Windpower (previously Cornwall Light and Power)
Rotherham
Authority
England

Planning and build timeline

Application submitted2004-11-01
Permission granted2008-03-28
41 months after submission
Operational2011-01-01
33 months after consent

What this site sits on

The recorded coordinate falls on land surveyed as Grade 2 agricultural land.

REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.

Other built sites within 15 km

SiteMWDistance
Holbrook Community Renewable Energy Centre
Biomass (dedicated) · Operational
6.56.7 km
Creswell Solar Park
Solar Photovoltaics · Operational
56.8 km
Hunciecroft Farm
Solar Photovoltaics · Operational
86.9 km
Land at Oxcroft Stocking Ground
Solar Photovoltaics · Operational
47.3 km
Oxcroft Solar Farm
Battery · Operational
17.3 km
Land at Oxcroft Stocking Ground
Solar Photovoltaics · Operational
37.3 km
Land at Bolsover Moor Quarry
Solar Photovoltaics · Operational
58.4 km
Penny Hill Lane
Wind Onshore · Operational
19.88.7 km

How big is Loscar Farm?

Loscar Farm has a recorded installed capacity of 4.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Loscar Farm?

REPD records the operator as REG Windpower (previously Cornwall Light and Power). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Loscar Farm approved and built?

The application was submitted on 2004-11-01. Permission was granted on 2008-03-28, 41 months later. The site became operational on 2011-01-01, 33 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 3247.