Pennington Recycling Centre is operational in New Forest with a recorded capacity of 1.2 MW, and has been generating since 2016-03-20.
Planning and build timeline
| Application submitted | 2015-07-08 |
| Permission granted | 2015-09-29 3 months after submission |
| Operational | 2016-03-20 6 months after consent |
What this site sits on
The recorded coordinate falls on land surveyed as Grade 2 agricultural land.
- Green Belt — New Forest
- Nutrient-neutrality catchment — Solent: Includes Chichester and Langstone Harbours SPA/Ramsar, Solent and Southampton Water SPA/Ramsar, Solent Maritime SAC, Portsmouth Harbour SPA/Ramsar
REPD gives one representative coordinate per scheme, not the site boundary, so this describes the point on record rather than the whole site — a large site can straddle a designation edge. Boundaries come from planning.data.gov.uk, which publishes for England only.
New Forest’s record on solar
New Forest has decided 20 solar farms and approved 75%, taking a median of 2.2 months. See every solar farm decision in New Forest →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Lower Pennington Farm Solar Photovoltaics · Operational | 2.7 | 0.7 km |
Efford Landfill (Newmilton) Landfill Gas · Operational | 2.8 | 7.7 km |
Wilmingham Lane Solar Farm Solar Photovoltaics · Operational | 7 | 7.9 km |
Double H Nurseries Biomass Plant Biomass (dedicated) · Operational | 1.5 | 8.2 km |
Beckley Solar Farm Solar Photovoltaics · Operational | 1.7 | 8.6 km |
Lee Farm Solar Photovoltaics · Operational | 5 | 9.6 km |
Homestead Farm Solar Photovoltaics · Operational | 10.7 | 9.8 km |
Office Field Solar Photovoltaics · Operational | 7.2 | 10.1 km |
How big is Pennington Recycling Centre?
Pennington Recycling Centre has a recorded installed capacity of 1.2 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pennington Recycling Centre?
REPD records the operator as Novus Solar Developments. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pennington Recycling Centre approved and built?
The application was submitted on 2015-07-08. Permission was granted on 2015-09-29, 3 months later. The site became operational on 2016-03-20, 6 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 5407.
Novarly Parcel · official public data, read properly · parcel.novarly.com