Mynydd Brombil Wind Farm
Mynydd Brombil Wind Farm is operational in Neath Port Talbot with a recorded capacity of 8 MW, and has been generating since 2017-01-15.
Planning and build timeline
| Application submitted | 2012-08-29 |
| Permission granted | 2015-07-08 34 months after submission |
| Operational | 2017-01-15 18 months after consent |
Neath Port Talbot’s record on onshore wind
Neath Port Talbot has decided 20 onshore wind schemes and approved 70%, taking a median of 24.6 months. See every onshore wind scheme decision in Neath Port Talbot →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Western Wood Energy Plant Biomass (dedicated) · Operational | 14 | 2.1 km |
Longlands Lane Wind Onshore · Operational | 1.5 | 2.2 km |
Margam Green Energy Plant Biomass (dedicated) · Operational | 40 | 2.2 km |
Pant-Y-Moch Farm Solar Photovoltaics · Operational | 5 | 2.3 km |
Caergarw Farm Solar Photovoltaics · Operational | 3.8 | 5.7 km |
Pioneer 2 - Hydrogen Production Facility Hydrogen · Under Construction | 2.5 | 5.9 km |
Baglan Bay Solar Farm - Phase 1 Solar Photovoltaics · Operational | 5 | 6.5 km |
Pen Y Cymoedd Wind Onshore · Operational | 228 | 8.8 km |
How big is Mynydd Brombil Wind Farm?
Mynydd Brombil Wind Farm has a recorded installed capacity of 8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Mynydd Brombil Wind Farm?
REPD records the operator as REG Windpower. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Mynydd Brombil Wind Farm approved and built?
The application was submitted on 2012-08-29. Permission was granted on 2015-07-08, 34 months later. The site became operational on 2017-01-15, 18 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 4193.