Pant-Y-Moch Farm
Pant-Y-Moch Farm is operational in Neath Port Talbot with a recorded capacity of 5 MW, and has been generating since 2016-01-06.
Planning and build timeline
| Application submitted | 2014-06-27 |
| Permission granted | 2014-10-31 4 months after submission |
| Operational | 2016-01-06 14 months after consent |
Neath Port Talbot’s record on solar
Neath Port Talbot has decided 12 solar farms and approved 100%, taking a median of 5.7 months. See every solar farm decision in Neath Port Talbot →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Mynydd Brombil Wind Farm Wind Onshore · Operational | 8 | 2.3 km |
Western Wood Energy Plant Biomass (dedicated) · Operational | 14 | 3.6 km |
Pioneer 2 - Hydrogen Production Facility Hydrogen · Under Construction | 2.5 | 4 km |
Longlands Lane Wind Onshore · Operational | 1.5 | 4.2 km |
Margam Green Energy Plant Biomass (dedicated) · Operational | 40 | 4.2 km |
Baglan Bay Solar Farm - Phase 1 Solar Photovoltaics · Operational | 5 | 4.6 km |
Briton Ferry Landfill Gas · Operational | 2 | 6.6 km |
Briton / Neath Landfill Gas · Operational | 2.2 | 6.7 km |
How big is Pant-Y-Moch Farm?
Pant-Y-Moch Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pant-Y-Moch Farm?
REPD records the operator as Canadian Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pant-Y-Moch Farm approved and built?
The application was submitted on 2014-06-27. Permission was granted on 2014-10-31, 4 months later. The site became operational on 2016-01-06, 14 months after consent.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1900.