Novarly ParcelRenewable sites

Renewable sitesPant-Y-Moch Farm

Pant-Y-Moch Farm

Pant-Y-Moch Farm is operational in Neath Port Talbot with a recorded capacity of 5 MW, and has been generating since 2016-01-06.

5 MW
Capacity
as recorded in REPD
Operational
Status
since 2016-01-06
Solar Photovoltaics
Technology
Canadian Solar
Neath Port Talbot
Authority
Wales

Planning and build timeline

Application submitted2014-06-27
Permission granted2014-10-31
4 months after submission
Operational2016-01-06
14 months after consent

Neath Port Talbot’s record on solar

Neath Port Talbot has decided 12 solar farms and approved 100%, taking a median of 5.7 months. See every solar farm decision in Neath Port Talbot

Other built sites within 15 km

SiteMWDistance
Mynydd Brombil Wind Farm
Wind Onshore · Operational
82.3 km
Western Wood Energy Plant
Biomass (dedicated) · Operational
143.6 km
Pioneer 2 - Hydrogen Production Facility
Hydrogen · Under Construction
2.54 km
Longlands Lane
Wind Onshore · Operational
1.54.2 km
Margam Green Energy Plant
Biomass (dedicated) · Operational
404.2 km
Baglan Bay Solar Farm - Phase 1
Solar Photovoltaics · Operational
54.6 km
Briton Ferry
Landfill Gas · Operational
26.6 km
Briton / Neath
Landfill Gas · Operational
2.26.7 km

How big is Pant-Y-Moch Farm?

Pant-Y-Moch Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Pant-Y-Moch Farm?

REPD records the operator as Canadian Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Pant-Y-Moch Farm approved and built?

The application was submitted on 2014-06-27. Permission was granted on 2014-10-31, 4 months later. The site became operational on 2016-01-06, 14 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1900.

Novarly Parcel · official public data, read properly · parcel.novarly.com