Caergarw Farm

Caergarw Farm is operational in Neath Port Talbot with a recorded capacity of 3.8 MW, and has been generating since 2017-03-20.

3.8 MW
Capacity
as recorded in REPD
Operational
Status
since 2017-03-20
Solar Photovoltaics
Technology
Suncredit UK (Sunventures 7)
Neath Port Talbot
Authority
Wales

Planning and build timeline

Application submitted2015-11-23
Permission granted2016-05-17
6 months after submission
Operational2017-03-20
10 months after consent

Neath Port Talbot’s record on solar

Neath Port Talbot has decided 12 solar farms and approved 100%, taking a median of 5.7 months. See every solar farm decision in Neath Port Talbot

Other built sites within 15 km

SiteMWDistance
Stormy Down Solar Farm
Solar Photovoltaics · Operational
3.83.7 km
Parc Stormy, Stormy Down
Wind Onshore · Operational
2.54.1 km
Stormy Down (Waste AD)
Anaerobic Digestion · Operational
34.2 km
Margam Green Energy Plant
Biomass (dedicated) · Operational
404.2 km
Longlands Lane
Wind Onshore · Operational
1.54.2 km
Newton Down
Wind Onshore · Operational
54.7 km
Seaview Farm
Solar Photovoltaics · Operational
1.75 km
Western Wood Energy Plant
Biomass (dedicated) · Operational
145.3 km

How big is Caergarw Farm?

Caergarw Farm has a recorded installed capacity of 3.8 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Caergarw Farm?

REPD records the operator as Suncredit UK (Sunventures 7). Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Caergarw Farm approved and built?

The application was submitted on 2015-11-23. Permission was granted on 2016-05-17, 6 months later. The site became operational on 2017-03-20, 10 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6035.