Pioneer 2 - Hydrogen Production Facility is under construction in Neath Port Talbot with a recorded capacity of 2.5 MW.
Planning and build timeline
| Application submitted | 2025-04-01 |
| Permission granted | 2025-06-23 3 months after submission |
| Operational | not recorded |
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Baglan Bay Solar Farm - Phase 1 Solar Photovoltaics · Operational | 5 | 0.6 km |
Briton Ferry Landfill Gas · Operational | 2 | 3.8 km |
Briton / Neath Landfill Gas · Operational | 2.2 | 4 km |
Pant-Y-Moch Farm Solar Photovoltaics · Operational | 5 | 4 km |
Swansea University Bay Campus Solar Photovoltaics · Operational | 0.2 | 4.1 km |
Mynydd Brombil Wind Farm Wind Onshore · Operational | 8 | 5.9 km |
Western Wood Energy Plant Biomass (dedicated) · Operational | 14 | 6.1 km |
Carn Nicholas Farm Solar Photovoltaics · Under Construction | 5 | 6.8 km |
How big is Pioneer 2 - Hydrogen Production Facility?
Pioneer 2 - Hydrogen Production Facility has a recorded installed capacity of 2.5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Pioneer 2 - Hydrogen Production Facility?
REPD records the operator as Protium Green Hydrogen Supply Limited. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Pioneer 2 - Hydrogen Production Facility approved and built?
The application was submitted on 2025-04-01. Permission was granted on 2025-06-23, 3 months later. The site is recorded as under construction and has no operational date yet.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 18704.