Novarly ParcelRenewable sites

Renewable sitesWest Hall Solar Farm

West Hall Solar Farm

West Hall Solar Farm is an operational 7 MW solar farm in Vale of Glamorgan, generating since 31 March 2014. Planning permission was granted on 17 January 2014, 6 months after submission. Operator of record: INRG Solar.

7 MW
Capacity
as recorded in REPD
Operational
Status
since 31 March 2014
Solar Photovoltaics
Technology
INRG Solar
Vale of Glamorgan
Authority
Wales

Planning and build timeline

Application submitted1 August 2013
Permission granted17 January 2014
6 months after submission
Operational31 March 2014
2 months after consent

Screening a site of your own?

RedlineUK · £39

Vale of Glamorgan approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with West Hall Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Vale of Glamorgan’s record on solar

Vale of Glamorgan has decided 25 solar farms and approved 96%, taking a median of 4.2 months. See every solar farm decision in Vale of Glamorgan

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
51.8 km
Solar Photovoltaics · Operational
4.44 km
Solar Photovoltaics · Operational
54.6 km
Solar Photovoltaics · Operational
7.56 km
Solar Photovoltaics · Operational
7.46.6 km
Solar Photovoltaics · Operational
56.7 km
Solar Photovoltaics · Operational
27.1 km
Solar Photovoltaics · Operational
77.2 km

How big is West Hall Solar Farm?

West Hall Solar Farm has a recorded installed capacity of 7 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates West Hall Solar Farm?

REPD records the operator as INRG Solar. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was West Hall Solar Farm approved and built?

The application was submitted on 1 August 2013. Permission was granted on 17 January 2014, 6 months later. The site became operational on 31 March 2014, 2 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 2359.

Novarly Parcel · official public data, read properly · parcel.novarly.com

All sites · Screen your own site · Planning by council · Coal mining search by postcode