Garn Solar Farm

Garn Solar Farm is an operational 7.4 MW solar farm in Vale of Glamorgan, generating since 12 May 2014. Planning permission was granted on 8 February 2013, 3 months after submission. Operator of record: Equitix.

7.4 MW
Capacity
as recorded in REPD
Operational
Status
since 12 May 2014
Solar Photovoltaics
Technology
Equitix
Vale of Glamorgan
Authority
Wales

Planning and build timeline

Application submitted16 November 2012
Permission granted8 February 2013
3 months after submission
Operational12 May 2014
15 months after consent

Screening a site of your own?

RedlineUK · £39

Vale of Glamorgan approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.

Screen a site here£39

Arrives prefilled with Garn Solar Farm’s recorded coordinate — swap in your own postcode or coordinates.

Consent ClockUK · Free

Granted years ago. Still not built. Every consented solar farm in the UK, computed against its statutory commencement deadline — which consents are about to lapse, and where.

Open Consent Clock →

Vale of Glamorgan’s record on solar

Vale of Glamorgan has decided 25 solar farms and approved 96%, taking a median of 4.2 months. See every solar farm decision in Vale of Glamorgan

Other built sites within 15 km

SiteMWDistance
Solar Photovoltaics · Operational
4.42.9 km
Solar Photovoltaics · Operational
64.7 km
Solar Photovoltaics · Operational
55.2 km
Solar Photovoltaics · Operational
7.55.8 km
Solar Photovoltaics · Operational
56.6 km
Solar Photovoltaics · Operational
76.6 km
Solar Photovoltaics · Operational
76.9 km
Solar Photovoltaics · Operational
37.1 km

How big is Garn Solar Farm?

Garn Solar Farm has a recorded installed capacity of 7.4 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.

Who operates Garn Solar Farm?

REPD records the operator as Equitix. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.

When was Garn Solar Farm approved and built?

The application was submitted on 16 November 2012. Permission was granted on 8 February 2013, 3 months later. The site became operational on 12 May 2014, 15 months after consent.

Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 1895.