Rosedew Farm
Rosedew Farm is an operational 5 MW solar farm in Vale of Glamorgan, generating since 29 March 2016. Planning permission was granted on 4 November 2022, 92 months after submission. Operator of record: INRG.
Planning and build timeline
| Application submitted | 2 March 2015 |
| Permission granted | 4 November 2022 92 months after submission |
| Operational | 29 March 2016 |
Screening a site of your own?
Vale of Glamorgan approves 96% of solar farms. Redline puts that number, and everything else the record holds, against your own boundary: the authority’s actual approval rate and decision times, every designation inside the red line, agricultural grade, 1 m LIDAR earthworks, how contested the grid is, and yield with a P90 — before you spend on a consultant.
Arrives prefilled with Rosedew Farm’s recorded coordinate — swap in your own postcode or coordinates.
Vale of Glamorgan’s record on solar
Vale of Glamorgan has decided 25 solar farms and approved 96%, taking a median of 4.2 months. See every solar farm decision in Vale of Glamorgan →
Other built sites within 15 km
| Site | MW | Distance |
|---|---|---|
Solar Photovoltaics · Operational | 2 | 3.3 km |
Solar Photovoltaics · Operational | 7 | 4.6 km |
Solar Photovoltaics · Operational | 4.4 | 5.8 km |
Solar Photovoltaics · Operational | 5 | 6 km |
Solar Photovoltaics · Operational | 7.4 | 8.5 km |
Solar Photovoltaics · Operational | 3.4 | 10 km |
Solar Photovoltaics · Operational | 7.5 | 10.3 km |
Solar Photovoltaics · Operational | 5 | 11.1 km |
How big is Rosedew Farm?
Rosedew Farm has a recorded installed capacity of 5 MW. That figure is the capacity registered in REPD, which is the scheme as consented — the metered output of a site can differ.
Who operates Rosedew Farm?
REPD records the operator as INRG. Ownership of built renewable assets changes hands regularly and REPD is published quarterly, so treat this as the operator of record rather than confirmation of who owns it today.
When was Rosedew Farm approved and built?
The application was submitted on 2 March 2015. Permission was granted on 4 November 2022, 92 months later. The site became operational on 29 March 2016.
Source: Renewable Energy Planning Database (REPD), Department for Energy Security and Net Zero, Open Government Licence v3.0, plus planning designation boundaries from planning.data.gov.uk (England only). REPD is published quarterly and covers schemes of roughly 150 kW and above. Capacity is the installed capacity on record, not metered generation. Operator is the operator of record at the last extract, not confirmation of present ownership. Reference 6369.
Novarly Parcel · official public data, read properly · parcel.novarly.com
All sites · Screen your own site · Planning by council · Coal mining search by postcode